Similar Projects
Tuscan Neighborhood Park - WCE901 - City of Elk Grove
Infrastructure
Conception
$5,383,000 CJ est. value
Elk Grove, CA 95624

Folsom Plan Area Fire Station #34 - City of Folsom
New Construction, Infrastructure
Conception
$10,800,000 CJ est. value
Folsom, CA 95630

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Poppy Grove Apartments
New Construction, Infrastructure
Design
$145,000,000 CJ est. value
Elk Grove, CA 95757

North Area Recovery Station Scale Installation Project
Infrastructure
Bidding
$780,000 CJ est. value
North Highlands, CA 95660

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Cold Plane AC Pavement, Place HMA and Replace Concrete Slabs
Infrastructure, Alteration
Post-Bid
$4,860,000 est. value
CA

Upper Multi-Purpose Area Repairs and Improvements Kiefer Landfill
Infrastructure
Results
$225,000 est. value
Sloughhouse, CA 95683

Folsom Boulevard Complete Streets Phase 1
Infrastructure
Results
$5,400,000 est. value
Sacramento, CA

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Ice Box
New Construction, Infrastructure - 1,200 SF
Pending Verification
$25,000,000 CJ est. value
Sacramento, CA 95811

Laguna Boulevard Right Turn Lane to West Stockton Boulevard - WTR058 - City of Elk Grove
Infrastructure
Conception
Elk Grove, CA 95758

Laguna Creek and Whitehouse Creek Multi-Functional Corridor Project - WDR018 - City of Elk Grove
Infrastructure
Design
$3,164,000 est. value
Elk Grove, CA

Duckhorn Drive Safety Improvement Project
Infrastructure
Post-Bid
$470,000 est. value
Sacramento, CA 95834

Last Updated 09/08/2022 01:31 AM
Project Title

AutoZone #5008 / Sacramento

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95835   (Sacramento County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

This project has been awarded.* *The Editorial Content team has obtained construction timeline information and construction documents directly from AutoZone

Details

1 Story Above Grade, 6,500 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents