Similar Projects
Lincoln Ave Rehabilitation - California To Silverado - City Of Napa
Alteration
Conception
$2,500,000 est. value
Napa, CA 94559

Imola Avenue Rehabilitation - Soscol to East End - ST22PW07 - City of Napa
Infrastructure
Conception
Less than $2,500,000 est. value
Napa, CA 94558

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

MT 3023 Measure T Street Rehabilitation at Various Locations
Infrastructure
Bidding
$285,000 est. value
Yountville, CA

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Silverado Trail Phase L Paving
Infrastructure
Results
$1,400,000 est. value
Napa, CA 94558

Cold Plane AC, Place HMA (TYPE A) and RHMA-G
Infrastructure
Results
$8,600,000 est. value
CA

Salvador Avenue Complete Streets - City of Napa
Infrastructure, Alteration
Conception
$1,000,000 est. value
Napa, CA 94558

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Napa Valley Vine Trail - Street Helena to Calistoga
Infrastructure
Results
$9,500,000 est. value
Calistoga, Saint Helena, CA 94574

Berry Street Pavement Rehabilitation
Infrastructure
Post-Bid
$300,000 est. value
Calistoga, CA 94515

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

2021 Annual Pavement Management Project
Infrastructure
Post-Bid
$613,700 est. value
American Canyon, CA

American Canyon Road Rehabilitation
Infrastructure
Results
$350,000 est. value
Saint Helena, CA 94574

Last Updated 06/22/2022 01:42 PM
Project Title

Hennessey Treatment Plant Paving Improvements - WQ23UT07 - City of Napa

Physical Address View project details and contacts
City, State (County) Napa, CA 94558   (Napa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Napa, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. Conduct upgrades and repairs to treatment plant roads subject to deferred maintenance over the past 10-15 years. The City's Lake Hennessey Treatment Plant contains assets spread across vast acreage that requires its own system of road infrastructure. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP). As of June 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents