Similar Projects
OR47: Nehalem River Bridge Project on the Nehalem Highway
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

Coleman Ck. (Phoenix) Project on the Rogue Valley Highway (Rt. No. OR99)
New Construction, Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Phoenix, OR

GAOA Burnt Cabin Trail Bridge Replacement
New Construction
Design
$250,000 to $500,000 est. value
Milton Freewater, OR

US26: Ten Eyck/wolf DR Vista Loop (Sandy) Sec
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

Southern Oregon Seismic Bridge Retrofit (Phase 2)
New Construction, Infrastructure
Results
$2,000,000 to $5,000,000 est. value
OR

Old Highway 99N: Oakland Bridge and Melrose Road: Conn Ford Bridge Project Oakland Shady Highway
New Construction, Infrastructure
Results
OR

Walla Walla River Road Bridge
New Construction, Infrastructure
Bidding
$500,000 to $600,000 est. value
Milton Freewater, OR

US30: Snake River (Ontario) Bridge Project on the Ontario Spur Highway (Rt. No. US30)
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

OR6: Mills (Wilson River) Bridge Project on the Wilson River Highway
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

US199: Holton Cr Pedestrian Bridge (Kerby) Project
New Construction, Infrastructure
Results
$500,000 to $1,000,000 est. value
OR

Latourell Creek Bridge
New Construction, Infrastructure
Post-Bid
$950,000 to $1,050,000 est. value
Corbett, OR 97019

OR153 Salt Creek Bridge Project on the Bellevue Hopewell Highway
New Construction, Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
OR

Last Updated 12/17/2021 01:39 AM
Project Title

OR82: Bear Creek (Wallowa River) Bridge Project on the Wallowa Lake Highway (Rt. No. Or82) Near Wallowa

Physical Address View project details and contacts
City, State (County) OR   (Wallowa County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $20,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Req. approx. 2,400 hr training; 494 ft2 temp. signs; 2 ea. PCMS; 7,000 hr flaggers; 2 ea. AFAD; 450 ft temp. gd. rl.; 812.5 ft temp. barr.; 1 ea. port. traff. sig.; 3 ea. temp. water manage. fac.; temp. retain. wall; 534 yd3 contam. soil disp.; const. surv. work; 5,800 yd3 gen. exc.; 650 yd3 found. exc.; 22,000 yd3 stone emb.; 1,380 yd2 filter blanket; 2,893 yd3 riprap; 630 yd3 trench found.; 928 ft culv. pipe; 1,670 ft2 paved culv. end slope; 3 ea. conc. MH; temp. work access & contain.; br. rem. work; 431 yd3 str. exc.; 456 yd3 gran. str. backfill; 190 yd3 gran. wall backfill; 227 yd3 drilled shaft conc.; 65,193 lb. drilled shaft reinf.; 277 ft drilled shafts; 82,478 lb. reinf.; 223,612 lb. coated reinf.; 375 lb. stainless stl. reinf.; 646 yd3 deck conc.; 494 yd3 gen. str. conc.; 293 yd2 reinf. conc. br. end panels; 973,413 lb. stl. plt. girder; 87 ft strip seals; 1,102 ft 3-tube curb mt. rl.; 253 ft2 retain. wall; 5,700 ton agg. base; 2,200 ton ACP; 312.5 ft gd. rl.; 30,500 ft long. paint striping; 19 ft2 signs; 2 ea. bioslope; 3 ac. perm. seeding; 3 ac. mulching.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.