Similar Projects
Road Runner #1043 Renovation
Addition, Renovation, Infrastructure
Design
$800,000 CJ est. value
Bryant, AR 72022

Pinnacle Point at Bryant
New Construction, Infrastructure - 82,000 SF
Design
$22,000,000 CJ est. value
Alexander, AR 72002

Benton Overlay No. 2 (S)
Infrastructure
Bidding
$600,000 CJ est. value
Benton, AR 72015

Benton Overlay No. 2 (S)
Infrastructure
Bidding
$600,000 CJ est. value
Benton, AR 72015

Mill and Asphalt Overlay of East Sevier Street
Infrastructure
Post-Bid
Benton, AR 72015

High Performance Cold Mix
Infrastructure
Post-Bid

Sevier Street - Geyer Springs Road (CONC PVMNT PRES)
Infrastructure
Results

Springlake Roundabout
Infrastructure
Results
Benton, AR

Midtown Bryant - Phase 3
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Bryant, AR 72022

Lombard Heights
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Bryant, AR 72022

Abbey Road Shopping Center
New Construction, Infrastructure - 7,500 SF
Design
$2,000,000 CJ est. value
Bryant, AR 72022

Alexander Overlay (S)
Infrastructure
Bidding
$600,000 CJ est. value
Alexander, AR 72002

Main Street Rehabilitation Sidewalk Project
Infrastructure
Post-Bid
Benton, AR

Statewide CLRS Improvements
Infrastructure
Results

Aria Convenience Store
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Bryant, AR 72022

Last Updated 02/07/2023 02:12 PM
Project Title

Express Oil Change / Benton

Physical Address View project details and contacts
City, State (County) Benton, AR 72015   (Saline County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Sub-Bidding Closed, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,750,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of new construction of an oil change facility. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to March 2023. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents