Similar Projects
Fitnation Synthetic Turf Installation 2023
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Gurnee, IL 60031

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Lakefront Environmental Operation and Maintenance Services
Term Contract
Post-Bid
Waukegan, IL

Willow Grove School Asbestos Removal
Infrastructure
Results
Buffalo Grove, IL 60089

2022 Asbestos Abatement
Alteration
Results
Fox Lake, IL 60020

Asbestos Removal at the Elementary School - Woodland Community Consolidated School District 50
Alteration
Post-Bid
$9,000 est. value
Gages Lake, IL 60030

Asbestos Abatement at Grass Lake Elementary School
Alteration
Results
$40,000 est. value
Antioch, IL 60002

Center Line Rumble Strip
Infrastructure
Post-Bid
$200,000 CJ est. value
Waukegan, IL 60085

Forest Park Beach Sand Nourishment
Infrastructure
Results
$258,363 CJ est. value
Lake Forest, IL 60045

Dormant Tree Pruning
Term Contract
Post-Bid
Libertyville, IL 60048

2023 Hourly Grounds Maintenance Contract
Term Contract
Results
$125,913 CJ est. value
Highland Park, IL 60035

Asbestos Abatement at Warren Township High School O'Plaine Campus
Term Contract, Infrastructure
Post-Bid
$25,000 CJ est. value
Gurnee, IL 60031

2022 Demolition Program
Demolition, Infrastructure
Post-Bid
$180,000 CJ est. value
North Chicago, IL 60064

Municipal Water Treatment Chemicals
Term Contract
Post-Bid
Lake Bluff, IL 60044

Refuse Disposal and Recycling Services for All Seven District Schools
Term Contract
Post-Bid
Antioch, IL 60002

Last Updated 07/03/2023 02:38 PM
Project Title

Multiple Step Phase II - Purchase of Photovoltaic Array (Pv) for the Regional Operations and Communications Facility

Physical Address View project details and contacts
City, State (County) Libertyville, IL 60048   (Lake County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This scope of services will include delegated design, permitting, licensing, certification, material, installation, interconnection, and project management as further identified within these design documents and specifications. PV output and monitoring controls will be required to integrate to Lake County's enterprise Building Automation System as identified within the project specifications. The design documents contain requirements for domestically produced steel to be utilized on this project. Bidders are advised that land development permits associated with the ROC primary structure have been pulled by the owner in advance of this solicitation, however, PV Array specific construction permits (including foundation design and compliance with the Libertyville Plan Commission requirements (SEE EXHIBIT B - Libertyville Architectural Review Committee Submittals) will be required of this bidder.) Additionally, this design has been developed by Wold AE in parallel with several other site improvements including: building construction and radio tower construction. While all contractors have been given a scope of services that provides independence to complete their contract, communication and coordination with the other contractors will be essential in dealing with site logistics and sequencing. The awarded contractor shall comply with substantial completion and delivery of the solar array no later than September 31st, 2024. Question Deadline 07/07/2023 at 12:00 PM CT

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents