Similar Projects
West Middle Kitchen Floor Replacement - Town of Andover
Renovation, Infrastructure
Conception
$500,000 est. value
Andover, MA 01810

Fire Hydrants
Infrastructure
Bidding
Beverly, MA

Gate Valves
Infrastructure
Bidding
Beverly, MA

Advanced Metering Infrastructure (AMI) Replacement
Infrastructure
Post-Bid
Ipswich, MA

Ductile Iron Pipe
Infrastructure
Post-Bid
Beverly, MA

Water and Sewer Supplies
Term Contract
Results
$340,000 est. value
Lawrence, MA

Water and Sewer Supplies
Results
Lawrence, MA

Repair Sleeves
Infrastructure
Bidding
Beverly, MA

School Street Water Main Improvements Project
Infrastructure
Post-Bid
$520,000 to $1,400,000 est. value
Manchester-By-The-Se, MA

2021 Water System Improvements
Results
$2,200,000 est. value
Marblehead, MA

Meaders Lane Neighborhood Infrastructure Improvements Project -- Phase I
Infrastructure
Post-Bid
$1,268,000 est. value
Salisbury, MA 01952

Leak Detection-Correlation Services
Results
Methuen, MA

Installing Ductile Iron Water Main With Associated Valves, Fittings, Hydrants, Services, Appurtenances, and Surface Restoration
Infrastructure
Post-Bid
$1,500,000 est. value
Rowley, MA

Water Distribution System Hydrant Replacements
Results
Less than $20,000 est. value
Saugus, MA

Dodge Road Water Main Construction, Contract No. 9
Infrastructure
Post-Bid
$200,000 est. value
Rowley, MA 01969

Reported 06/24/2022 02:15 PM
Project Title

Minor Storm Drainage Improvements - DPW-8 - Town of Andover

Physical Address View project details and contacts
City, State (County) Andover, MA 01810   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to provide funds to address maintenance and repairs of storm drains. The specific locations to be addressed will be determined by the Public Works Director and staff. This project is included in the town's FY 2022-2026 Capital Improvement Program. As of June 23, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The contact(s) will not accept phone call inquiries at this time.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents