Project Title | Unified State Lab #1 Loop Road and Sidewalk Addition |
Physical Address | View project details and contacts |
City, State (County) | Taylorsville, UT 84129 (Salt Lake County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $115,848 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Only Paving/site/civil Firms Pre-qualified During Stage I Of The Rfs Are Allowed To Bid On This Project Project Description: Sawcut existing asphalt. Remove existing asphalt pavement. Remove existing road base / subgrade to 11" below finish grades. Sawcut and remove existing curb and gutter. Sawcut and remove existing sidewalks. Remove and dispose section of gravel walk. Remove existing trees. Remove and dispose of sod and irrigation system. Remove and preserve existing parking signs. Over excavate an additional 12" of soft subgrade and fill with pit-run material. Provide and install stabilization fabric. Cut and fill to subgrade elevations. New storm drain catch basin. New 8" Dia. SDR-35 storm drain line. Provide and install new concrete sidewalk. Provide and install accessible ramp. Provide and install new curb & gutter. Provide and install new 3'-0" wide concrete waterway. Provide and install new 2'-0" wide concrete waterway. Provide and install 6" thick concrete pad with 6" aggregate base and #4 bars. Install 8" road base. Install 3" asphalt. Install 4" wide parking stall striping. Install pedestrian pathway striping. Paint direction arrows and directions. Relocate existing signs with new post and base. Provide and install new sign, post, and base. Provide and install new gravel walk. Flush system and clean-out debris from existing and new storm drain catch basins. Provide and install new landscaping per landscaping sheets. General Conditions. Project mobilization. Erosion control, sweep, and dust control. Construction survey and staking. Traffic control and pedestrian safety. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |