Similar Projects
Chrome Works
New Construction, Infrastructure
Design
$88,000,000 CJ est. value
Salt Lake City, UT 84101

Pura Vita Senior Housing
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
West Jordan, UT 84088

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SoHi Apartments
New Construction, Infrastructure - 169,093 SF
Post-Bid
$40,000,000 CJ est. value
Salt Lake City, UT 84101

SoHi Apartments
New Construction, Infrastructure - 169,093 SF
Post-Bid
$40,000,000 CJ est. value
Salt Lake City, UT 84101

2021 South Salt Lake City Micro-Surface Seal Project
Results
Salt Lake City, UT 84111

Bengal Blvd and 2300 East Round-About Intersection Modification
Infrastructure
Results
$1,500,000 to $3,000,000 est. value
UT

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

Bueno Avenue Apartments
New Construction, Infrastructure
Pending Verification
$24,000,000 CJ est. value
Salt Lake City, UT 84102

At 2100 Apartments II
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Salt Lake City, UT 84115

Huntsman Mental Health Institute Utah Translational Research Facility
New Construction, Infrastructure - 185,000 SF
Post-Bid
$105,000,000 CJ est. value
Salt Lake City, UT 84108

Tax Commission Building Concrete/Irrigation Repairs
Infrastructure
Results
$195,000 est. value
Salt Lake City, UT 84103

Dowland Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
South Salt Lake, UT 84115

Liberator Drive Warehouse
New Construction, Infrastructure - 50,250 SF
Design
$10,000,000 CJ est. value
Kearns, UT 84118

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Last Updated 02/17/2023 03:06 PM
Project Title

Unified State Lab #1 Loop Road and Sidewalk Addition

Physical Address View project details and contacts
City, State (County) Taylorsville, UT 84129   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $115,848 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Only Paving/site/civil Firms Pre-qualified During Stage I Of The Rfs Are Allowed To Bid On This Project Project Description: Sawcut existing asphalt. Remove existing asphalt pavement. Remove existing road base / subgrade to 11" below finish grades. Sawcut and remove existing curb and gutter. Sawcut and remove existing sidewalks. Remove and dispose section of gravel walk. Remove existing trees. Remove and dispose of sod and irrigation system. Remove and preserve existing parking signs. Over excavate an additional 12" of soft subgrade and fill with pit-run material. Provide and install stabilization fabric. Cut and fill to subgrade elevations. New storm drain catch basin. New 8" Dia. SDR-35 storm drain line. Provide and install new concrete sidewalk. Provide and install accessible ramp. Provide and install new curb & gutter. Provide and install new 3'-0" wide concrete waterway. Provide and install new 2'-0" wide concrete waterway. Provide and install 6" thick concrete pad with 6" aggregate base and #4 bars. Install 8" road base. Install 3" asphalt. Install 4" wide parking stall striping. Install pedestrian pathway striping. Paint direction arrows and directions. Relocate existing signs with new post and base. Provide and install new sign, post, and base. Provide and install new gravel walk. Flush system and clean-out debris from existing and new storm drain catch basins. Provide and install new landscaping per landscaping sheets. General Conditions. Project mobilization. Erosion control, sweep, and dust control. Construction survey and staking. Traffic control and pedestrian safety.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents