Similar Projects
Chipotle #4483 / Alco
New Construction, Infrastructure - 2,325 SF
Bidding
$700,000 CJ est. value
Alcoa, TN 37701

Chipotle #4483 / Alco
New Construction, Infrastructure - 2,325 SF
Bidding
$700,000 CJ est. value
Alcoa, TN 37701

Laurel Branch Park Site Preparation and Sewer Extension
Infrastructure
Post-Bid
Maryville, TN 37801

Taco Bell
Renovation
Post-Bid
Maryville, TN 37801

2021 Road Improvements
Term Contract
Results
Louisville, TN 37777

Great Smoky Mountain NP Oliver Cabin Trail Paving
Term Contract
Results
$75,000 to $125,000 est. value
Townsend, TN

Yassin Falafel Waffle House
New Construction
Pending Verification
Maryville, TN

Frogpond Road Subdivision
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Friendsville, TN 37737

RFP - 246 North Rankin Road Development
New Construction, Infrastructure
Bidding
$235,798 CJ est. value
Alcoa, TN 37701

Shooting Range Site Preparation
Infrastructure
Post-Bid
Maryville, TN 37801

Grading, Drainage and Paving on a S.I.A Route (Singleton Station Road) Serving Project Pearl
Infrastructure
Results
Louisville, TN 37777

Stone Creek Office and Warehouse
New Construction, Infrastructure - 17,099 SF
Pending Verification
$2,000,000 CJ est. value
Maryville, TN 37803

US 321 Landscape Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Maryville, TN 37804

2021 Tuckaleechee Pike Resurfacing
Infrastructure
Post-Bid
Maryville, TN

Great Smoky Mountains National Park
Alteration
Results
$10,000,000 est. value
TN

Last Updated 11/15/2022 02:06 PM
Project Title

Avocado Market & Deli

Physical Address View project details and contacts
City, State (County) Alcoa, TN 37701   (Blount County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the renovation of an existing building to be used as a market and gas station. As of November 15, 2022, this project is in the final drawing approval and permitting stages. It will be reviewed by the City of Alcoa Planning Commission on November 17, 2022. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to second quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents