Similar Projects
2021 Courtyard Improvements
Bidding
Tinley Park, IL 60477

Replace Refueler Parking Area - General
Infrastructure
Bidding
Less than $700,000 est. value
Peoria, IL 61607

Mack Road Multi-Use Path and Bridge Reconstruction
Post-Bid
$250,000 to $500,000 est. value
Warrenville, IL 60555

Lot Repairs at Champaign Sign Shop
Post-Bid
Champaign, IL 61820

Construct A Pedestrian Underpass From Burlington Avenue, Through the BNSF Railway Embankment
Results
Western Springs, IL 60558

(3.10 Mile) Overlay, Pedestrian Ramp New Hma Shoulders On Il- 173 Shoulders On Il- 173 From Green Bay Rd To Sheridan Rd . Drainage Improvement Between Hebron Ave. And Galilee Ave. In The City Of Zion.
Results
Zion, IL

Overlay and ADA Pedestrian Ramps
Infrastructure
Bidding
Chicago, IL 60632

A/E Services For Repair/Resurface Roadways And Sidewalks
Renovation
Post-Bid
Less than $6,600,000 est. value
Springfield, IL 62794

Parking Lots - Nerge Lift, Huntington Lift & Greenleaf Pump Stations
Results
$50,529 est. value
Elk Grove Village, IL 60007

(1.73-Mile) Smart overlay and ADA improvements on US 14 (Peterson Avenue) from US 41 to Ridge Avenue.
Infrastructure
Bidding
IL

Professional Services for Ladue Place Sidewalk and Stairs
Post-Bid
Greenville, IL

Union Ridge Elementary School Parking Lot Improvements
Results
Harwood Heights, IL 60706

Guardrail and Traffic Barrier Terminal Improvement, 0.1 mile North of Luther Drive in Byron to 0.1 mile South of Beltline Road South of Rockford
Infrastructure
Bidding

2021-2022 Miscellaneous Repair Contract
Term Contract
Post-Bid
Urbana, IL

Greenfield Park Pathway Improvements
Results
Northbrook, IL 60062

Last Updated 05/28/2021 04:49 PM
Project Title

Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Cahokia, IL 62206   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BASE BID includes repair and replacement of asphalt parking lots at Estelle Sauget School of Choice Bus Garage, Cahokia High School and Maplewood Elementary School. See drawings for order of construction and / or phasing of work. ALTERNATE BID #1 includes PCC Pavement in-lieu of Full depth HMA at the locations noted within the plan set, noted as Estelle Sauget (Bus Garage Lot), Maplewood (Circle Drive at Nash Street) and High School (Circle Drive). Alternate Bid #1 shall include all other applicable items included in the Base Bid work not replaced by the substitution of PCC pavement.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents