Similar Projects
Winton Circle Drainage Improvements
Bidding
$800,000 est. value
FL 32086

Kings Road Drainage Improvements
Bidding
$638,765 est. value
FL 32086

Design-Build Services for Moultrie Trails Area Drainage Improvements
Results
Less than $1,997,028 est. value
Saint Augustine, FL 32084

Dredged Material Management Area Du-2 and SJ-1 Shoreline Improvements
Results
Less than $1,467,747 est. value

Clean and Desilt Box Culverts
Results
Less than $250,000 est. value

Santa Maria Boulevard Drainage Improvements
Results
Less than $2,173,000 est. value
Saint Augustine, FL 32084

3rd Alley Ditch Drainage Improvements
Results
Saint Augustine, FL 32080

Deep Creek Conservation Area - Ditch Blocks Installation
Results
Less than $59,310 est. value
FL

Coastal Storm Risk Management Project, South Ponte Vedra and Vilano Beach, St. Johns County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

Second Call - Halfmile Creek Mitigation Area, Trail Road Improvements and Low Water Crossing
Results
Less than $22,000 est. value
FL

Fabrication and Installation of Removable Flood Barriers for the Waste Water Treatment Plant
Results
Saint Augustine, FL

FEMA Project - Old A1A South Berm Restoration
Results
Less than $1,152,098 est. value
FL

CDBG-DR Project: Avenue D and Tart Road Drainage Improvements
Results
Less than $680,364 est. value
Saint Augustine, FL 32084

Drainage Repair on SR 207
Results
Less than $240,000 est. value
FL

Design-Build Services for Hurricane Matthew FEMA Cat. B Emergency Berm Restoration
Results
Less than $11,584,996 est. value
FL

Last Updated 04/22/2021 10:02 AM
Project Title

Desilt Drainage Structures

Physical Address View project details and contacts
City, State (County) FL   (Saint Johns County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $85,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, equipment, and incidentals to remove and dispose of silt, debris, vegetation, soil, rock, or any type of blockage inside a pipe or box culvert on State rights-of-way. Section 0001 Clean Drainage Structures (Lf) e430- 94- 1 Desilt Pipe, 0 To 24" Lf 3,500.000 e430- 94- 2 Desilt Pipe, 25-36" Lf 5,600.000 e430- 94- 3 Desilt Pipe, 37-48" Lf 2,200.000 e430- 94- 4 Desilt Pipe, 49-60" Lf 1,100.000

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents