Similar Projects
RFQ Design - Professional Services for Design of an Indoor SportsPlex
New Construction, Infrastructure
Conception
$60,000,000 CJ est. value
Owensboro, KY 42303

Paul Laurence Dunbar High School Expansion - Fayette County Public Schools
Addition, Renovation, Infrastructure
Conception
$17,600,000 CJ est. value
Lexington, KY 40513

Riverport Tangent Loop Track
Infrastructure
Design
$200,000 CJ est. value
Louisville, KY 40202

Campbell Call 108
Infrastructure
Design
$3,000,000 CJ est. value
Alexandria, KY 41001

Fayette County Elementary School Zone Enhancements Project
Infrastructure
Bidding
$500,000 CJ est. value
Lexington, KY 40508

Asphalt Surface With Grade and Drain - US-60
Infrastructure
Bidding
$300,000 CJ est. value
Hawesville, KY 42348

Life Safety Upgrade Rough River State Park
Infrastructure
Sub-Bidding
$213,000 CJ est. value
Falls of Rough, KY 40119

Culvert Pipe
Infrastructure
Post-Bid
Catlettsburg, KY

Creek Bank Repair
Infrastructure
Post-Bid
Buckhorn, KY 41721

306 Blankenbaker Lane Drainage Improvement
Results
$80,000 to $110,000 est. value
Louisville, KY 40207

Baseball Field Backstop Safety System
Results
Union, KY 41091

Norton Healthcare Hospital at Opportunity Campus
New Construction, Infrastructure - 60,000 SF
Construction
$70,000,000 CJ est. value
Louisville, KY 40211

Merchants Ice Tower Redevelopment
Infrastructure, Build-out, Renovation
Pending Verification
$12,000,000 CJ est. value
Louisville, KY 40204

Vogt Retail Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Louisville, KY 40202

Eugene Gay Community Splash Pad - City of Winchester
Infrastructure
Conception
$600,000 CJ est. value
Winchester, KY 40391

Last Updated 08/05/2022 07:34 AM
Project Title

Parks - Barren River Irrigation Pond Replace Liner

Physical Address View project details and contacts
City, State (County) Lucas, KY 42156   (Barren County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $262,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a temporary construction entrance. Drain the pond by pumping water into the reservoir downstream of the spillway. Continue to pump water, as needed, for the duration of the project. Remove the rock from the perimeter of the pond. Some portion of existing rock may be considered for reuse if well graded, clean, and satisfactorily similar to new rock. Remove the existing liner. Install/construct temporary concrete spillway inlet protection. Repair or construct built up soil curb around the perimeter of the pond in approximately the same location as the existing. Excavate the anchor shelf and anchor trench. Install 10 OZ. Non-woven geotextile liner. Install 40 mil HDPE geomembrane liner. Install No. 2 stone from the anchor trench to the built up curb around the entire perimeter of the pond. Install low mobility grout at the base of intake pipe support. Ensure seal of existing intake by installing HDPE pipe boot. Remove the spillway inlet protection. Stabilize all disturbed areas around the pond. Remove the construction entrance and stabilize the area. Estimated Length of Project: 60 (Substantial Completion) + 15 (Final Completion) No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening of bids. The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents