Similar Projects
The Tribute
New Construction, Infrastructure
Conception
$95,000,000 CJ est. value
Palm Coast, FL 32137

Secure Space Self Storage
New Construction, Infrastructure - 31,500 SF
Design
$3,400,000 CJ est. value
Palm Coast, FL 32137

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

North Flagler County Dune Restoration Project
Infrastructure
Bidding
$200,000 CJ est. value
Bunnell, FL 32110

Take 5 Car Wash / Palm Coast
New Construction, Infrastructure - 4,755 SF
Sub-Bidding
$1,200,000 CJ est. value
Palm Coast, FL 32164

Hargrove Grade Road Reconstruction - Flagler County
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bunnell, FL 32110

Hargrove Grade Road Reconstruction - Flagler County
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bunnell, FL 32110

FY21 Water System Improvements
Infrastructure
Results
$390,848 est. value
Flagler Beach, FL

Lift Stations BU-6 and BB-1 Rehabilitation
Renovation
Results
$700,000 to $1,000,000 est. value
Palm Coast, FL 32137

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Plantation Bay Section 2A-F Unit 16
New Construction, Infrastructure
Pending Verification
$29,000,000 CJ est. value
Bunnell, FL 32110

Par Builders Storage
New Construction, Infrastructure - 103,255 SF
Pending Verification
$11,000,000 CJ est. value
Bunnell, FL 32110

Flagler Health+ Village at Palm Coast
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Palm Coast, FL 32137

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2022 Pump Station Replacements
Renovation
Results
Palm Coast, FL 32164

Last Updated 11/18/2022 10:19 AM
Project Title

Sewer Laterals and Lift Stations CIPP and Spray Polyurethane Lining

Physical Address View project details and contacts
City, State (County) Flagler Beach, FL 32136   (Flagler County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $722,158 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 18, 2022, project was awarded to Advanced Plumbing Technology, awarded amount is $722,157.72. The City of Flagler Beach is accepting bids for the Construction of sewer laterals & lift stations cipp and spray polyurethane lining. Work includes inspection, televising, and CIPP lining to 200 sewer laterals and 2 (two) lift stations. All bids are solicited and shall be made pursuant to the Code of Ordinances, City of Flagler Beach, Chapter 2, Article VI, Division 2, Section 2-256, and all bids will be evaluated in accordance with the provisions thereof. Code of Ordinances, City of Flagler Beach is on file in the Office of the City Clerk, City Hall, 105 S. 2nd Street, Flagler Beach, Florida. Any addenda to these documents will be posted on City website. It is the bidder s responsibility to confirm that all addenda have been received prior to submitting a bid. All questions should be directed in writing to the City Clerk at Poverstreet@cityofflaglerbeach.com. A certified check or bank draft, payable to the City of Flagler Beach, Florida or a satisfactory bid bond executed by the Bidder and an acceptable surety, in an amount equal to of the bid shall be submitted with each bid. NO bid shall be withdrawn for a period of sixty (60) days subsequent to the bid opening without the consent of the City of Flagler Beach, Florida. Upon award, the successful bidder will also be required to furnish and pay for a satisfactory contract one Construction Bonds to be recorded by the vendor, with the Clerk of the Court, Flagler County, Florida and to enter into a contract for services with the City of Flagler Beach (hereafter known as City. All bidders are required to complete and submit a Certificate of Liability Insurance, the Public Entity Crime Statement, the Anti-collusion Statement and Drug Free Tie Bid Preference Statement. No bids received after the time and date specified for the opening will be considered. The City of Flagler Beach, Florida reserves the right to reject any and all bids, to waive any and all non-substantial irregularities in bids received, whenever such waiver or rejection is in the best interest of the City. All questionsshould be directed in writing to the City Clerk at Poverstreet@cityofflaglerbeach.com. Questions shall be submitted by October 12, 2022 at 5:00 PM The Contractor shall furnish all labor, superintendence, materials, plant power, light, heat, fuel, water, tools, appliances, equipment, supplies, and means of construction necessary for proper performance and completion of the Work. The Contractor shall obtain and pay for all necessary local building permits. The Contractor shall perform and complete the work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Engineer, and in strict accordance with the Contract Documents. The Contractor shall clean up the Work and maintain it during and after construction, until accepted, and shall do all Work and pay all costs incidental thereto. He shall repair or restore all structures and property that may be damaged or disturbed during performance of the Work. 2. The cost of incidental work described in these Project Requirements, for which there are no specific Contract Items, shall be considered as part of the general cost of doing the Work and shall be included in the prices for the various Contract Items. No additional payment will be made, therefore. 3. The Contractor shall provide and maintain such modern plant, tools, and equipment as may be necessary, in the opinion of the Engineer, to perform in a satisfactory and acceptable manner all the Work required by this Contract. Only equipment of established reputation and proven efficiency shall be used. The Contractor shall be solely responsible for the adequacy of his workmanship, materials, and equipment, prior approval of the Engineer notwithstanding.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents