Similar Projects
Repavement of the Streetscape and Flag Pole Installation at the Justice Center
Infrastructure, Alteration
Bidding
Clayton, MO 63105

Repair Parking Lot and Loading Dock Infrastructure
Infrastructure
Bidding
Rolla, MO 65401

Spanish Pond ADA Improvements
New Construction
Post-Bid
MO 63138

Main Park and Heritage Park Sidewalk
Post-Bid
Washington, MO

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

Sidewalk Maintenance and Curb Ramp Construction
Term Contract
Results
$1,700,000 est. value
Springfield, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Pedestrian Crossing Downtown
New Construction, Infrastructure
Pending Verification
$278,000 est. value
Columbia, MO

Trail Improvements on the Osage Trail Levee
Infrastructure
Bidding
Warsaw, MO

2021 Curb, Gutter, Sidewalk and Trail Program- Phase 1
Post-Bid
Gladstone, MO

Sidewalk Brick Band Replacement
Results
Kirksville, MO

Pinkerton Properties Warehouse
New Construction, Alteration - 24,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
O Fallon, O'Fallon, MO

West Meyer Road Phase 3
Infrastructure
Bidding
Wentzville, MO

Shelby County R-IV School District-Parking Lot Improvements
Post-Bid
$850,000 est. value
MO

City Hall Parking Lot Maintenance and Improvements
Results
Weldon Spring, MO

Last Updated 08/12/2021 12:13 PM
Project Title

Curb and Gutter/Paving Jac Street and Removal and Replacement of Asphalt at Fire Station 1

Physical Address View project details and contacts
City, State (County) Republic, MO 65738   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work includes: Curb and Gutter/Paving Jac Street Extending a new local road, Jac Street approximately 396 LF, including paving of 5 ½ inch asphalt base, 1 ½ inch asphalt driving course, 4 inch base rock, 2’ curb and gutter each side . approximately 1056 SY of asphalt, approximately 846 LF of curb and gutter . City will install inlet boxes, waterline, sewer and prepare subgrade to within ± ½ inch prior to selected contractor work beginning. Removal & Replacement of Asphalt at Fire Station 1 Removal and replacement full depth (8 inch) of approximately 3040 SY of parking lot pavement at Fire station 1. Drive lane shall be replaced with heavy duty Asphalt or concrete in drive lane Approximately 920 SY. Millings from fire station parking lot will remain property of the City of Republic and shall be delivered to City owned property at ZZ and M Highway.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents