Similar Projects
2021 Woodland Drive Extension
Bidding
$300,000 est. value
Beaver Dam, WI 53916

Roadwork
Bidding
Lebanon, WI

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Green Street Reconstruction
Bidding
Fox Lake, WI 53933

Columbia County Road Improvements
Renovation
Post-Bid
Columbus, WI

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Wiley Road Improvements
Bidding
Lebanon, WI

Wendt Road in Town of Columbus and Berkvam Road in Town of Otsego
Renovation
Post-Bid
Columbus, WI

Fox Lake - Waupun, Edgelawn Drive to West Street, C. Waupun, Fox Lake Street, West Street to STH 49
Results
Fox Lake, Waupun, WI 53933

Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

2021 Chip Seal
Post-Bid
$82,938 est. value
Portage, WI

C. Portage, Wisconsin and Dewitt Sts, Ontario Street to E. Pleasant Street
Results
Portage, WI 53901

Last Updated 03/15/2021 02:46 AM
Project Title

Portage - Fox Lake, STH 22 to 0.19 MI. W. of Morris Drive, Pardeeville - Manchester, CTH P to STH 33

Physical Address View project details and contacts
City, State (County) Fox Lake, Pardeeville, Portage, WI 53954 (Columbia, Dodge Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 1,000 CY; Borrow, 47 CY; Base Aggregate Dense, 19,350 Ton; Marking Epoxy, 190,442 LF; Construction Staking, 66,322 LF; Construction Staking, 4 Each; Construction Staking, 2 LS; Culvert Pipe, 90 LF 24”, 98 LF 36“; Concrete Curb and Gutter, 2,692 LF; Beam Guard, 500 LF; Beam Guard Energy Absorbing Terminals, 4 Each; Asphaltic Surface, 426 Ton; HMA Pavement, 55,860 Ton; Removing Asphaltic Surface Milling, 46,830 SY; Tack Coat, 37,460 Gals; CIR Asphaltic Base Layer, 167,900 SY; Mill and Relay, 7,040 SY; Asphalt Stabilizing Agent, 750 Ton; Riprap, 18 CY; Flashing Stainless Steel, 132 LF; Concrete surface Repair, 25 SF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents