Similar Projects
Open End Agreements - Small Renovation and Construction Projects (2022)
Renovation, Term Contract
Bidding
Less than $500,000 est. value
Boone, NC 28607

Open End Agreements - Small Renovation and Construction Projects (2022)
Renovation, Term Contract
Bidding
Less than $500,000 est. value
Boone, NC 28607

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Engineering, Planning and Development
Post-Bid

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

IDIQ Contract for Architect-Engineer Services for Compliance with Air Emission Regulations, EPCRA Regulations, Greenhouse Gas & All Other Environmental Media Regulations
Post-Bid

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Architect and Engineering Services for Production Technical Services (PTS) for FEMA's Risk MAP Program
Post-Bid
$10,000 to $300,000,000 est. value

Highway and/or Bridge Design and Engineering Services
Results
Less than $80,000,000 est. value

C1JZ--National Region AE IDIQ
Post-Bid
$20,000,000 est. value

Last Updated 08/19/2022 04:05 PM
Project Title

RFP Construction Manager at Risk - Duncan Hall Renovation and Peacock Hall/Business

Physical Address View project details and contacts
City, State (County) Boone, NC 28607   (Watauga County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $45,000,000 [brand] Estimate
Plans Available from Project Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This project is comprised of two aspects: the full renovation of Edwin Duncan Hall & the addition to and subsequent renovation of the Walker College of Business located in Peacock Hall. The projects are combined because of their close proximity and schedules Construction Management at Risk services are required for an addition to (and possible renovation of) a college of business as well as a complete renovation of an adjacent academic facility in Boone, NC. Appalachian State University is accepting proposals for a Construction Manager at Risk for the combined projects of the Edwin Duncan Hall Renovation and the Walker College of Business Addition/Renovation until August 18th, 2022 at 4:00 PM in the Office of Planning, Design & Construction at 2458 Highway 105 South, Boone, NC. This project is comprised of two individual projects effecting the east side of campus to be executed under one design firm and CM@R contract. The two projects are (A) the Edwin Duncan Hall Renovation and (B) the Walker College of Business Addition and Renovation. Project Description A) -Edwin Duncan Hall Renovation CP# 20220463: This project will completely gut and renovate Duncan Hall, including adding / refurbishing elevators, building envelope repairs, adding a sprinkler system, completely revamping HVAC, and giving the overall building a face lift while adapting to current and future programming needs. The 97,997 GSF building was constructed in 1965 and there have been numerous inhouse small renovations. The goal is for the building to remain an academic office / classroom building. The construction budget for this piece of the project is $15,749,486.00. Project Description B -Walker College of Business Addition/Renovation #20200468: This project is for a new addition to the Walker College of Business located currently at Peacock Hall. The current 116,000 sqft facility serves nearly 25% of campus students. The new adjacent, approximately 54,000 sqft. structure is to be dedicated to various classrooms/labs, office spaces, common & special use areas, mechanical infrastructure space and bridging to the existing building on the 1st and 2nd floor levels. The construction budget for this part of the project is $19,607,00.00. Further, a partial renovation of the adjoining COB Peacock Hall is anticipated with pending funding.

Details

54,000 SF.
Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents