Similar Projects
Serene Lake Elementary Additions and Partial Replacements - Mukilteo School District
Addition, Demolition, Renovation, Infrastructure
Conception
$20,000,000 CJ est. value
Edmonds, WA 98026

Explorer Middle School Additions and Partial Replacements - Mukilteo School District
Addition, Demolition, Renovation, Infrastructure
Conception
$30,000,000 CJ est. value
Everett, WA 98204

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

County Forces Projects - Rivershore Road Flood Repair
Infrastructure
Design
$207,595 est. value
Clearview, WA 98290

Warm Beach Water System Water Replacement
Infrastructure
Post-Bid
$2,000,000 est. value
Stanwood, WA 98292

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

Tulalip Water Pipeline Mortar Repair
Infrastructure
Results
$1,000,000 est. value
Everett, WA 98201

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

Lord Hill Regional Park - Snohomish County
Term Contract
Pending Verification
$5,000,000 CJ est. value
Snohomish, WA 98290

Northwest Washington Rehab Hospital
New Construction, Infrastructure - 52,500 SF
Pending Verification
$15,000,000 CJ est. value
Lynnwood, WA 98087

270th Street NW Self Storage Facility
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Stanwood, WA 98292

SR 524/Olympic Ave Vic To 48th Ave W Vic - ADA Compliance
Infrastructure
Design
$2,296,000 CJ est. value
Snohomish, WA 98296

Skagit Wildlife Area North Leque Restoration
Infrastructure
Post-Bid
$375,000 est. value
Stanwood, WA

Swift Brt Orange Line Construction
Infrastructure
Results
Everett, WA 98201

Behavioral Health Center - Tulalip Tribe / Lake Ketchum
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Lake Ketchum, WA 98292

Last Updated 03/31/2023 05:37 AM
Project Title

Decant Facility Retrofit

Physical Address View project details and contacts
City, State (County) Mountlake Terrace, WA 98043   (Snohomish County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $79,320 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project will reconstruct the City of Mountlake Terrace's decant facility located at the Public Works Facility at 6204 215th St SW in Mountlake Terrace, Washington. The decant facility is designed to separate solids from liquids from sewer, water, and stormwater cleaning operations. The facility consists of three large covered bays where street and utility cleaning equipment can be emptied and washed. Two bays of the facility will be reconstructed to relieve the system from clogging and to improve access by large equipment. The Work includes erosion and sediment control, demolition and removal of materials, protection of existing facilities, installation of concrete slabs and HMA pavement, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the 2022 WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal Construction. A building permit for this project has already been obtained by the city. This contract will be awarded in accordance with the contract specifications. In the event the successful bidder fails to furnish an approved bond and fails to sign the contract within ten (10) calendar days after notification of award. Other proposals will then be reconsidered for award by Owner in order starting with the next lowest bidder. Contractor shall be required to have the Contract physically completed within thirty (30)working days from the Notice to Proceed Date. Performance Bond - To be executed by successful Bidder and Surety Company. Email a copy, mail the original. Labor and Material Payment Bond - To be executed by successful Bidder and Surety Company. Email a copy, mail the original Contractor to submit a Bond for 5% of the contract amount in lieu of retainage. Questions or clarifications regarding this Invitation for Bid must be received by 4 PM on Monday, March 13, 2023. All work performed on this project is subject to state prevailing wage rates. The estimated cost of construction is between $60,000 and $75,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents