Similar Projects
Water and Power North Roof Top Unit Replacement
Infrastructure
Bidding
Loveland, CO

HVAC Services
Term Contract
Post-Bid
Wellington, CO 80549

Building Automation Upgrade
Post-Bid
CO

ECAO Comm Room A/C Systems Replacement
Results
Loveland, CO 80528

HP 22 and ERV Install at the Municipal Building
Results
Loveland, CO

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Annual Maintenance - HVAC Services Including Repair and Maintenance
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

HVAC and Mechanical Products
Term Contract
Post-Bid

UCA Duct Insulation Replacement
Results
Fort Collins, CO

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Epic Center Cooling Tower and Pumps
Results
Fort Collins, CO 80525

Challenger Point - Mechanical Renovation
Alteration
Post-Bid
Fort Collins, CO 80526

Heat Exchanger Tube Bundles
Results

USAFA Fy22 Grease Laden Duct Cleaning Service
Term Contract
Post-Bid

Heating, Air Conditioning and Refrigeration Services
Term Contract
Results
Loveland, CO

Reported 02/05/2022 12:00 AM
Project Title

Munter Dehumidifiers Removal of Old and Installation of New Units

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80521   (Larimer County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal existing munter units and install new munter units located at 1111 S. Mason Street, Fort Collins, CO 80625. The contractor shall perform the removal and installation of three (3) new Munter package units located on the third-floor mechanical room at NLGRP. Demolish of Munter units will need to be phased in to ensure minimal disruption to scientific research being conducted on the second floor. Contractor will install valves, shutoffs, and peripheral equipment for water cooled systems associated with post cooling systems. Contractor will be required to install all plumbing associated with operation of Munter units. Water cooled coil must either be closed loop system and contractor shall follow manufacturer specifications. Contractor is required to field verify all water supply and drainage requirements prior to installation of units. The contractor will install new electrical disconnects associated to safe shutoff of equipment. The contractor will install new electrical conduit and wire per National Electrical code and Life Safety codes. USDA will supply the Munter package units to be installed full. The contractor shall submit all material relating to both plumbing and electrical installation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents