Project Title | Aerobic Granular Sludge - Phase I |
Physical Address | View project details and contacts |
City, State (County) | Rockford, IL 61109 (Winnebago County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $45,480,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Aerobic Granular Sludge-Phase I A. AGS Reactors which consists of: a. Four AGS Reactors containing Aerobic Granular Sludge Equipment. b. Pipe Gallery with two stair towers, piping, valving, metering, HVAC, and plumbing. c. WAGS/WLC Wetwell with three submersible pumps. d. All civil, structural, architectural, electrical, mechanical/HVAC, instrumentation and controls, and piping and valves for a complete, operable Aerobic Granular Sludge system. B. AGS Support Facilities which consists of: a. Blowers containing three high speed gearless turbo blowers, air piping, and appurtenances. b. MCC containing MCCs, VFDs, panels, and controls. c. All civil, structural, architectural, electrical, mechanical/HVAC, instrumentation and controls, and piping and valves for a complete, operable AGS Support Facilities. C. Modifications and connections to existing yard structures, which consists of: a. Distribution Chamber. b. Primary Filter Effluent Diversion Structure. c. Filter Effluent Pumping Station. d. Overflow Structure. e. Inlet Sewer Manhole. D. Site and Structure Demolition, which consists of: a. Trickling Filter Nos. 2 and 4. b. Drainage Pump Station. c. Meter Vault. d. Bypass Chamber. e. Pavements, yard piping and electrical duct bank.A. AGS Reactors which consists of: a. Four AGS Reactors containing Aerobic Granular Sludge Equipment. b. Pipe Gallery with two stair towers, piping, valving, metering, HVAC, and plumbing. c. WAGS/WLC Wetwell with three submersible pumps. d. All civil, structural, architectural, electrical, mechanical/HVAC, instrumentation and controls, and piping and valves for a complete, operable Aerobic Granular Sludge system. B. AGS Support Facilities which consists of: a. Blowers containing three high speed gearless turbo blowers, air piping, and appurtenances. b. MCC containing MCCs, VFDs, panels, and controls. c. All civil, structural, architectural, electrical, mechanical/HVAC, instrumentation and controls, and piping and valves for a complete, operable AGS Support Facilities. C. Modifications and connections to existing yard structures, which consists of: a. Distribution Chamber. b. Primary Filter Effluent Diversion Structure. c. Filter Effluent Pumping Station. d. Overflow Structure. e. Inlet Sewer Manhole. D. Site and Structure Demolition, which consists of: a. Trickling Filter Nos. 2 and 4. b. Drainage Pump Station. c. Meter Vault. d. Bypass Chamber. e. Pavements, yard piping and electrical duct bank. E. Site work, yard piping, and electrical improvements. E. Site work, yard piping, and electrical improvements. For general apprenticeship questions, please contact the Illinois Works Office at CEO.ILWorks@Illinois.gov. A BID bond payable to the OWNER must accompany each BID for five percent (5%) of the total amount of the BID. As soon as the BID prices have been compared, the OWNER will return the BONDS of all except the three (3) lowest responsible BIDDERS. When the Agreement is executed the bonds of the two (2) remaining unsuccessful BIDDERS will be returned. The BID BOND of the successful BIDDER will be retained until the payment BOND and performance BOND have been executed and approved, after which it will be returned. A certified check may be issued in lieu of a BID BOND. A performance BOND and payment BOND, each in the amount of one hundred percent (100%) of the CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. The FRSA PROJECT ENGINEER is Scot Strassburg, PE. His direct line is (815) 387-7657 and his email address is sstrassburg@fourrivers.illinois.gov. Inspection trips for prospective BIDDERS will leave from the FRSA office located at 3501 Kishwaukee Street, Rockford, Illinois 61109. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete the PROJECT through substantial completion within 548 consecutive calendar days and through final completion within 609 consecutive calendar days thereafter. BIDDER further agrees to pay as liquidated damages, the sum of $2,000.00 and $1,000.00 for each consecutive calendar day after the time of substantial completion, and final completion, respectively. Project No. 411752 |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||