Similar Projects
"Project Pumpkin" Distribution Center and Office Warehouse
New Construction - 673,186 SF
Design
$100,000,000 est. value
Huntley, IL 60142

M-8 Maintenance Facility Eastbound Access
Bidding
Less than $59,000 est. value
IL

2021 Polk Avenue Roadway and Utility Improvement
Bidding
Carpentersville, IL

Edgelawn Bikeway Project Phase 3 Construction Engineering Services
Renovation
Post-Bid
Less than $408,000 est. value
Aurora, IL 60505

Central Division - Asphalt Paving Maintenance
Post-Bid

2020 Street Resurfacing Program
Results
Elgin, IL 60120

Reconstruct the Intersection of Anderson Road at Keslinger Road
Results
Elburn, IL 60119

Kane County Jail Drive Resurfacing
Alteration
Bidding
Saint Charles, IL 60174

Site Paving
Post-Bid
Elgin, IL 60120

5.6 Miles, Standard Overlay, ADA Improvements, Bridge Repairs, West Rd to Strom Dr in the City of Elgin
Results
Elgin, IL 60120

2021 CDBG Resurfacing Program
Infrastructure
Bidding
Carpentersville, IL

Asphalt
Term Contract
Post-Bid
Saint Charles, IL

Pavement Removal, Drainage Structures, Placement Of Subbase Granular Material, Hot-Mix Asphalt Pavement And Installation Of Thermoplastic Pavement Markings
Results
IL

2021 Eastside Resurfacing
Infrastructure
Bidding
Carpentersville, IL

Chip Seal Parking Lot and Roadway Improvements
Post-Bid
Elgin, Saint Charles, IL 60175

Last Updated 05/11/2021 07:48 AM
Project Title

2021 Sugar Grove Township Resurfacing

Physical Address View project details and contacts
City, State (County) Sugar Grove, IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

3.15 Miles; Resurfacing of various routes within Sugar Grove Township. This work shall consist of the placement of Bituminous Materials (Tack Coat), Hot Mix Asphalt Surface Course, Hot Mix Asphalt Surface Removal, Class D Patching, Short-term Pavement Marking and all incidental, appurtenant and collateral work therefor (collectively the “project”) necessary to complete the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents