Similar Projects
Scott County Housing Authority Lead Abatement
Alteration
Bidding
$120,000 est. value
Winchester, IL

Cisne High School Gym Floor Repairs
Alteration
Bidding
$400,000 est. value
Cisne, IL 62823

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

CM at Risk - Partial High School Replacement and Junior High School/High School Renovation
Renovation
Results
Toulon, IL 61483

Central Dietary - Asbestos Work
Renovation
Results
Less than $150,000 est. value
Elgin, IL 60123

2022 Dugout Redesign at Dupo High School
Renovation
Bidding
$112,666 est. value
Dupo, IL 62239

Prairie MS Campus and Station MS Campus
Post-Bid
Barrington, IL

Richwoods High School Science Lab Renovation Phase II
Renovation
Results
Peoria, IL 61614

Asbestos Abatement
Renovation
Post-Bid
Des Plaines, IL 60018

New Athletic Lockers at Lake Park East High School
Renovation
Results
Elgin, IL

Centennial HS Phase 7 Asbestos Abatement
Post-Bid
Champaign, IL 61821

Fieldcrest High School 2021 Building Improvements
Renovation, Addition - 80,960 SF
Results
Minonk, IL 61760

Asbestos Abatement at Learning and Career Center
Post-Bid
Prospect Heights, IL 60070

Summer 2021 Renovation Projects
Renovation
Results
Byron, IL 61010

Last Updated 06/29/2022 10:18 AM
Project Title

Asbestos Abatement for 2022 Flooring Renovations at Northlawn Junior High School

Physical Address View project details and contacts
City, State (County) Streator, IL 61364   (La Salle County)
Category(s) Education, Single Trades
Sub-Category(s) Environmental, Flooring, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and asbestos abatement for an educational facility in Streator, Illinois. Completed plans call for site work for an educational facility; and for asbestos abatement for a educational facility. The work is to remove floor tile and associated mastic from various classrooms utilizing gross removal methods. The Date of Commencement is June 20, 2022. The Date of Substantial Completion is July 1, 2022.

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents