Similar Projects
USH 14 - Re/Reconditioning / Mill and Overlay
Infrastructure
Conception
$1,000,000 est. value
Evansville, WI 53536

North West Interceptor Splitter Box Construction and Slip Lining - City of Beloit
Renovation, Infrastructure
Conception
$250,000 CJ est. value
Beloit, WI 53511

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Asphalt Milling/Pulverizing
Infrastructure
Post-Bid
WI

Paving East Stateline Road from Dry Creek East to Freechurch Road
Infrastructure
Post-Bid
$300,000 est. value
WI

2021 Crack Sealing
Infrastructure
Results
Beloit, WI

2022 Street and Utility Improvements
Infrastructure
Results
Orfordville, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Hart Road Storm Water Pond - City of Beloit
Infrastructure
Conception
$400,000 CJ est. value
Beloit, WI 53511

Bergen - Emerald Grove RR OPS/ Crossing Repair/ Resurface
Infrastructure
Design
$250,000 CJ est. value
Clinton, WI 53525

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Last Updated 06/26/2023 07:00 PM
Project Title

Merrill Street Reconstruction - 77611998-92062 - City of Beloit

Physical Address View project details and contacts
City, State (County) Beloit, WI 53511   (Rock County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $305,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 26, 2023, an engineer has been selected and this project is in the design phase. A firm timeline for start of construction has not been determined. This project is included in the City of Beloit’s FY 2023-2028 CIP. This project will include the design and reconstruction of Merrill Street between Third Street and Fourth Street. Watermain will be replaced and upsized in this block. The entire project will be designed and constructed in 2023. Beloit has an estimated 12,350 feet of 4-inch or smaller size main that should be replaced to 6-inch or greater. This project will replace approximately 275 LF of 4" water main on Merrill (3rd St to 4th St). In addition to the water main 8 water services would be replaced, many of which are currently lead. This project is eligible for the American Recovery Plan Act (ARPA) funding based on the lead water services, sub-6" watermain. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents