Similar Projects
Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

Influent Pumping Station
Renovation
Bidding
$330,000 est. value
Savannah, TN

WTP and Blue Ribbon Parkway Booster Station Improvements
Renovation
Bidding
$3,500,000 est. value
Shelbyville, TN

Lupton Drive Chronic SSO Elimination
Renovation
Post-Bid
Chattanooga, TN 37400

Design/Build Services to Repair/Replace the Sanitary Sewer System at the Jacobs Civilian Conservation Center
Post-Bid
$500,000 to $1,000,000 est. value
Bristol, TN

Sanitary Sewer Cured In Place Pipe Lining (CIPP) Blanket Contract
Results
Less than $2,000,000 est. value
Chattanooga, TN 37402

Storm and Sanitary Sewer Revisions at Lupton City Mill
Results
Less than $598,589 est. value
Chattanooga, TN 37402

Sprinkler System
Renovation
Construction
Clarksville, TN 37040

Lookout Mountain Sanitary Sewer Rehabilitation Project - Phase 2
Alteration
Bidding
Chattanooga, TN 37403

Sewer System Improvements Express Mart Pump Station Replacement
Post-Bid
TN 37847

Sewer Video and Sonar Inspection Services
Results
Less than $765,000 est. value
Chattanooga, TN 37405

Sewer Rehab Project
Term Contract
Bidding
$500,000 to $1,000,000 est. value
Nashville, TN 37076

Sewer Replacement
Post-Bid
Jamestown, TN

Water and Sewer Line Replacement
Results
$180,000 to $220,000 est. value
Jellico, TN

Old Walton Sewer Extension
Infrastructure
Bidding
Cookeville, TN

Last Updated 03/10/2022 11:20 AM
Project Title

Taylor ES Pump Station and Sanitary Sewer (Force Account)

Physical Address View project details and contacts
City, State (County) Cleveland, TN 37323   (Bradley County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Providing the materials for use by the Owner to install ten (10) grinder pump stations. In general, the materials required to complete this work include: PVC Pipe and Fittings, PVC appurtenances, HDPE Pipe, Conduit and Electrical wiring with accessories.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents