Similar Projects
PWSD Well Equipment Replacement Project
Bidding
Parker, CO

Centrate Tank Mixing and Pumping Modifications
Infrastructure
Bidding
$400,000 est. value
Castle Rock, CO 80108

2021 Planned Well Rehabilitation and Well Abandonment / Denver Basin Aquifer Wells
Post-Bid
Castle Rock, CO

Rueter-Hess Well House Modifications Progressive
Post-Bid
Parker, CO 80134

2021 Alluvial Well Rehabilitation Project
Results
Castle Rock, CO

LDA-12 and De-8 Well Maintenance Project
Results
Castle Rock, CO

Dakota Replacment Well 1R
Infrastructure
Post-Bid
Larkspur, CO

Construction of Wells Lda-8, Lda-14, & De-14
Results
Castle Rock, CO

Well SA-1 Re-Drilling Project
Infrastructure
Post-Bid

Well System and Booster Pump Maintenance
Infrastructure
Results
Castle Rock, Franktown, Highlands Ranch, Larkspur, Littleton, Parker, Sedalia, CO 80138

Pump and Motor Installation for Wells LDA-8, LDA-14, and DE-14
Infrastructure
Post-Bid
Castle Pines, CO

Arapahoe Well A-10 Casing Repair Project
Infrastructure
Results
CO

2022 Alluvial Well Rehabilitation Project
Infrastructure
Results
Castle Rock, CO

LDA-10R and DE-10R Well Maintenance Project
Infrastructure
Results
Castle Rock, CO

2022 Replacement Well A-1R project
Infrastructure
Results
$550,000 est. value
Highlands Ranch, CO

Last Updated 05/25/2022 05:15 PM
Project Title

2022 Planned Rehabilitation of Denver Basin Aquifer Wells

Physical Address View project details and contacts
City, State (County) Castle Rock, CO   (Douglas County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of rehabilitating and installing new pumping equipment into Wells CR-124, CR-45, CR-83, CR-150, CR-47, CR-225 and CR-222 as outlined in the ITB. Principal items of work include supplying all labor, tools and equipment necessary to complete the rehabilitation and installation of new pumping equipment as outlined: • Comprehensive well cleaning program, including sand pumping sediment from bottom of hole. • New submersible pump and motor per specifications outlined for each well in the Scope of Work. • Replacement of existing drop pipe with drop pipe per specifications or will be replaced with stainless steel.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents