Similar Projects
Z--Paint Inside and Outside of Water Tanks
Term Contract
Design
$100,000 to $250,000 est. value
Harrison, AR

Rehabilitate an Existing 150,000-Gallon Elevated Water Storage Tank
Infrastructure
Post-Bid
Mountain View, AR

Water System Improvements
Renovation
Post-Bid
Kingsland, AR 71652

Construction – Round Mountain Standpipe
Infrastructure
Results
Fayetteville, AR 72701

East End 2021 Water Improvements Contract 1 – Water Storage Tank
Infrastructure
Results
Little Rock, AR

Water System Improvement - Contract II - Storage Tank Rehabilitation
Infrastructure
Post-Bid
Chidester, AR

Township Tank Improvements
Infrastructure
Results
Fayetteville, AR

Construction of an 810,000-Gallon Clearwell
Infrastructure
Post-Bid
Bull Shoals, AR

Tank Painting and Rehab
Term Contract
Results
Cabot, AR 72023

Cheyenne Ground Storage Tank Replacement
Infrastructure
Post-Bid
$260,000 est. value
AR

Fish Hauling Tanks
Infrastructure
Results
Little Rock, AR

Water System Improvements
Infrastructure
Post-Bid
AR

Mt. Holly and Old Wire Road Tanks
Infrastructure
Results
Camden, AR

Construction - Benson Water Tank
Infrastructure
Post-Bid
Fayetteville, AR

Annual Water Storage Tank Cleaning and Inspection - 2022
Term Contract, Infrastructure
Results
$191,000 est. value
Little Rock, AR

Last Updated 12/24/2021 04:06 AM
Project Title

Cleaning, Repairing and Painting 2,000,000-Gallon Elevated Reservoir Tower Park Tower

Physical Address View project details and contacts
City, State (County) Rogers, AR 72756   (Benton County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents