Similar Projects
Building 4 Riverwoods Mill
New Construction - 7,000 SF
Design
$1,500,000 est. value
Saint George, UT 84770

Springdale Wastewater Lagoon Improvements Sand Filtration
Renovation, Infrastructure
Sub-Bidding
$600,000 CJ est. value
Springdale, UT 84767

Remodel of the Structure at 680 Zion Park Boulevard
Post-Bid
Springdale, UT 84767

Captiveaire Application Engineering Office
Renovation - 10,500 SF
Post-Bid
Saint George, UT 84770

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

SGES Bore Project - Riverside Drive
Infrastructure
Results
Saint George, UT 84790

Black Desert Resort
New Construction
Construction
Ivins, UT

Intercap Lending TI
Renovation - 3,580 SF
Construction
Saint George, UT 84770

Building 4 At The Foundry
New Construction - 3,900 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Saint George, UT 84770

Tech Ridge
New Construction - 1,512,000 SF
Pending Verification
$10,000,000 CJ est. value
Saint George, UT 84770

Sky Mountain Power Substation Grading and Utilities
Infrastructure
Post-Bid
Hurricane, UT

Merrill Road Office Building
New Construction - 29,713 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Saint George, UT 84790

Boulder Creek Crossing Phase 2 Lots 10 & 12
New Construction - 14,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Saint George, UT 84790

Red Cliffs Subdivision - Sitework
Infrastructure
Post-Bid
Hurricane, UT 84737

River Crossing
New Construction
Pending Verification
Saint George, UT 84790

Last Updated 07/26/2022 04:06 PM
Project Title

Onset Financial Core & Shell Bid Package #4

Physical Address View project details and contacts
City, State (County) St George, UT 84770   (Washington County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This bid invitation is for Bid Package #4 on the Onset Financial headquarters office building located on Dixie Drive in St. George, Utah. The construction on this project consists of a steel structure, 4-level office building that is approximately 58,000 sf. Construction began mid-June 2022 and is planned to reach substantial completion in late 2023. Bid Package #4 Scopes: Masonry Decorative Railings Millwork/Finish Carpentry Waterproofing Insulation Vapor Retarder Air Barrier Roofing Fire/Smoke Protection Joint Sealants Doors/OH Doors Framing/Drywall Tile Acoustical Ceiling Flooring Athletic Flooring Wall Coverings Paint Specialties Roller Shades Athletic Equipment Landscaping Information regarding scopes of work, bid and project schedules, and site logistics are located in the bid manual. The bid manual will be uploaded to the Files/Plan Room within one week of this initial bid invitation. A bid notice will be sent out to all bidders via email notifying them that the bid manual is available. Once the bid manual has been uploaded, please thoroughly read the bid manual for specifics regarding the various scopes for this project. The bid manual contains a bid form that we ask bidders to fill out and return with their proposals. Filling this form out accordingly will help with bid leveling as well as job cost accounting. All questions and RFIs must be submitted to Derek Muir (CC: Kyle Wight) before Tuesday, July 12, 2022 @ 3:00 PM. General correspondence, questions, and RFIs should be sent to all Okland contacts listed below: Derek Muir - derek.muir@okland.com - (801) 866-6937 CC: Kyle Wight - kyle.wight@okland.coma

Details

4 Stories Above Grade, 58,000 SF Parking Space/Stalls, 223 Parking Spaces.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents