Similar Projects
Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Fire Hydrant
Infrastructure
Bidding
New York, NY

Ontario, Cooper, Lockport, and Franklin Streets Waterline Replacement
Infrastructure
Bidding
Olcott, NY 14126

Corliss Pump Station Improvement Project Valve Installations
Post-Bid
Rensselaer, NY 12144

Lafayette Avenue Rehabilitation
Post-Bid
Geneva, NY 14456

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

Installation of Cone Valves at East Delaware Tunnel Outlet
Results
$721,650 to $976,350 est. value
Neversink, NY 12765

Directional Drill (Main Line and Water Services)
Infrastructure
Bidding
Phelps, NY

Additional Water System Improvements
Post-Bid
Montour Falls, NY 14865

Water District No. 13 Water Main Installation
Results
Clarendon, NY 14429

Frontage Neighborhood Water Main Replacement
Infrastructure
Bidding
Elmsford, NY 10523

Couplings and Valves
Post-Bid
White Plains, NY 10601

Water System Improvements - Town of Hamburg and West Seneca, City of Lackawanna
Results
Hamburg, Lackawanna, West Seneca, NY

Large Valve Vault Replacement 2021
Infrastructure
Bidding
$424,000 est. value
Rochester, NY

City of Dunkirk Willowbrook Avenue Storage Tank Transmission Main
Post-Bid
Dunkirk, NY 14048

Last Updated 09/17/2021 09:22 AM
Project Title

2021 Water Main Lining and Lead Service Replacement

Physical Address View project details and contacts
City, State (County) Rochester, NY   (Monroe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,800,400
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the work includes the replacement of existing lead, lead-lined and galvanized water services (between the water main and curb stop) with new polyethylene or copper water service lines, inclusive of the water main tap, service saddle (if required), service tubing, curb stop and box and connection to the customer’s service line. A full service line flush from the water main to the meter is required following the service installation. The work includes surface restoration of disturbed areas.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents