Similar Projects
New Maintenance/Nutrition/Transportation Building
New Construction
Conception
$9,400,000 est. value
Paradise, CA

Eureka Emergency Operations Center - City of Eureka
New Construction
Conception
Eureka, CA

Santa Barbara County New Probation Headquarters
New Construction, Infrastructure
Design
$31,879,957 CJ est. value
Santa Barbara, CA 93101

CDBG - Needs Center Project
Renovation - 1,323 SF
Bidding
$344,000 CJ est. value
Taft, CA 93268

East Quincy Transfer Station Repairs
Renovation
Bidding
$71,000 CJ est. value
Quincy, CA 95971

Cal Fire Conservation Camp Replace Kitchen
Renovation, Alteration - 4,800 SF
Post-Bid
$9,099,500 est. value
Paynes Creek, CA 96075

CHP Garberville Area Office - Landscape Maintenance Services
Renovation, Alteration
Post-Bid
Redway, CA 95560

Building Work
New Construction
Results
$24,300,000 est. value
CA

Exterior Renovations Building 1405
Renovation
Results
$600,000 est. value
San Luis Obispo, CA 93405

FY2022-23 Data Center Environmental System and Passport Center HVAC Replacement - 500277 - City of Roseville
Renovation
Conception
$460,000 est. value
Roseville, CA 95678

NASA AFRC Facilities Operations and Maintenance Services
Renovation
Post-Bid
Edwards, Palmdale, CA 93523

Building 905 Renovation
Renovation
Results
$1,260,000 est. value
San Miguel, CA 93451

FY2022-23 Civic Center - Renovation and Rehabilitation - 500275 - City of Roseville
Renovation
Conception
$718,750 est. value
Roseville, CA 95678

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Columbia State Historic Park - General Repairs - Multiple Buildings - Phase 2
Renovation
Results
$650,000 to $950,000 est. value
Columbia, CA 95310

Last Updated 10/07/2022 04:32 AM
Project Title

Ventura Harbor Village - 1567 Spinnaker Drive Facade Renovation Project

Physical Address View project details and contacts
City, State (County) Ventura, CA 93001   (Ventura County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $698,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be constructed hereunder is located at the Ventura Harbor Village, at 1567 Spinnaker Drive, Suite 101, approximately one-half mile north of the Santa Clara River and westerly of Harbor Boulevard in the City of San Buenaventura. 4 DESCRIPTION OF WORK - The work consists of: 1. The Façade Renovation on all sides of the building and interior building improvements for shell space (for a future restaurant NIC). AWARD OF CONTRACT. Bidder understands, acknowledges, and agrees that bids for the work described herein are for one (1) building identified in Section 4, above, as the Owner determines in its sole and absolute discretion. Bidder further understands, acknowledges, and agrees that it must submit bids on items listed on the Bid Sheet attached to the Bid in order to qualify. Bidder understands that Owner will award only one bid item and shall be awarded to only one (1) lowest responsible bidder as selected by the Owner in its sole and absolute discretion. The Owner reserves the right, after opening bids, to reject any or all bids, or to make award to one (1) lowest responsible bidder on any of the bid items set forth on the Bid Sheet attached to the Bid and reject all other bids on any of said bid items, in the manner set forth under the California Uniform Public Construction Cost Accounting Act pursuant to Public Contract Code Section 22000 et seq. Bids will be compared on the basis of the District's Engineer's estimate of NIB-2 the quantities of the several items of work as shown on the Bid Sheet(s). A good faith determination by the Owner as to whether a bid is responsive or whether a bidder is responsible shall be final, conclusive and binding, and shall not be the basis of a claim for lost profits or damages of any kind whatsoever by a bidder to whom the contract is not awarded. The Owner will award a contract or reject all bids within 90 days of the bid opening and no bid may be withdrawn during that period. The Owner reserves the right to waive or seek correction of immaterial errors in a bid, in Owner's sole discretion. The Owner's determination that an error is immaterial shall be final, conclusive and binding on all bidders. 7 CERTIFIED CHECK AND BONDS. Each bid shall be accompanied by cash, a certified cashier's check, or by a corporate surety bond on the form furnished by the District, as a guaranty that the bidder will, if an award is made to bidder in accordance with the terms of bidder's bid, promptly secure worker's compensation insurance and liability insurance, execute a contract in the required form, and furnish satisfactory bonds for the faithful performance of the contract and for the payment of claims of materialmen and laborers thereunder. Said cash, check, or surety bond shall be in an amount not less than 10 percent of the total highest amount of any bid item set forth on the Bid Sheet (see illustrations provided on page B-1 of Bid). Faithful Performance Bonds and Payment Bonds shall each be for not less than 100 percent of the amount set forth by the Contractor on Contractor's Bid Sheet. The Owner reserves the right to reject any bond if, in the opinion of the Owner's Legal Representative, the Surety's acknowledgement is not in the form included in the contract documents or in another substantially equivalent form as prescribed by law. The bid security of unsuccessful bidders shall be returned to such bidders within sixty (60) days of the time the award of contract is made. 8 PREVAILING RATES OF WAGES. In accordance with the provisions of the California Labor Code, the Director of the Department of Industrial Relations of the State of California has ascertained and determined the general prevailing rates of wages for general, holiday and overtime work in the locality in which the work is to be performed. These wages are published and available for inspection at the District's office. It shall be mandatory upon the contractor to whom the contract is awarded and upon any subcontractor under the contractor to pay not less than the prevailing specified rates to all workers employed by them in the execution of the contract. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Job site notices required by Labor Code Section 1771.4 shall be posted. Contractors and subcontractors failing to comply with the prevailing wage requirement are subject to debarment by the Labor Commissioner, as provided in Labor Code Section 1771.1. Debarred contractors are declared ineligible to perform work on any public works project, either as the prime contractor or a subcontractor. 9 CONTRACT DOCUMENTS. The contract documents shall consist of this Notice Inviting Bids, the Instructions to Bidders, the accepted Bid, the Bid Sheet, the Contractor's Licensing Statement, the List of Subcontractors, the Bid Security Form or Bid Bond, the Agreement, the Faithful Performance Bond, the Payment Bond, the Non-Collusion Affidavit, the General Conditions of the Contract, the Special Conditions of the Contract, and the Detail Specifications and Drawings, all of which are on file in the office of the General Manager, Ventura Port District, Ventura, California. SECURITY FOR PERFORMANCE. Pursuant to California Public Contract Code Section 22300, securities may be substituted for any moneys withheld by the Owner to ensure performance under the contract. If such securities are desired to be utilized by any bidder, they shall be utilized in accordance with the provisions of Public Contract Code Section 22300 and, as required by those provisions, the bidder shall bear any expenses incurred due to the use of such securities. 11 BIDDER OBLIGATIONS. Each bidder shall carefully examine the drawings, read the specifications and the forms of the contract documents, and shall visit the site of the proposed work to fully inform bidder as to all existing conditions and limitations that may affect the execution of work under the contract, and shall include in the prices bid the cost of all incidentals and appurtenances. The failure or omission of any bidder to receive or examine any form, instrument, addendum, or other document, or bidder's failure to visit and become acquainted with the conditions at the construction site, shall in no respect relieve bidder from any obligation imposed by bidder's bid or by the contract. The submittal of a bid shall be taken as prima facie evidence of compliance with all instructions contained herein. 12 CLASSIFICATION OF CONTRACTORS' LICENSES; REGISTRATION WITH DEPARTMENT OF INDUSTRIAL RELATIONS. Contractors submitting a proposal shall possess, at the time the contract is awarded, the following class of contractor's license(s) issued pursuant to Division 3, Chapter 9, of the Business and Professions Code of the State of California Classification B General Building Contractor. The Contractor shall certify that the license(s) specified are the classification(s) required to perform the Work contemplated under the Contract Documents. Contractor shall provide Owner with their Contractor's license number and expiration date as provided in the Proposal, and shall present satisfactory evidence that they are licensed in good standing. Contractors submitting proposals shall be registered with the Department of Industrial Relations, as provided in Labor Code Section 1725.5, and shall include evidence that they are so registered with their proposal. The Contractor shall begin work within ten (10) days after the date set forth in the Notice to Proceed and shall complete all work under the contract within seventy-five (75) days

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents