Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Heights Road Culvert Replacement
Infrastructure
Post-Bid
Berwick, PA 18603

Laubach Drive Steam Line Replacement
Infrastructure, Alteration
Post-Bid
Bloomsburg, PA 17815

State Game Lands #183 Shooting Range Improvements
Results
Palmyra, PA

Chesapeake Bay Watershed Pollution Reduction
Infrastructure
Results

SR 487 over Abandoned RR
Infrastructure
Conception
$2,210,000 CJ est. value
Scott, PA 17815

Alleghenyville Road (SR 3024) over I-176
Infrastructure
Design
$4,171,810 CJ est. value
Brecknock Township, PA 19540

Honeysuckle Lane Stormwater Mitigation Project
Infrastructure
Post-Bid
$60,000 CJ est. value
Bloomsburg, PA 17815

Taylor Road Project
Infrastructure
Results
Millville, PA 17846

SR 42 from Poor House Road to Catawissa Creek
Infrastructure
Conception
$2,073,000 CJ est. value
Catawissa, PA 17820

Substructure Contract
Infrastructure, Renovation
Design
$1,350,000 CJ est. value
Bloomsburg, PA 17815

Paving Contract
Infrastructure
Post-Bid
$200,000 CJ est. value
Catawissa, PA 17820

Last Updated 04/21/2023 01:04 PM
Project Title

Sullivan County Stream Stabilization Program

Physical Address View project details and contacts
City, State (County) Benton, PA 17814   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $72,230 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 21, 2023, this project has not yet been awarded. The project is expected to be awarded on April 25, 2023. The Sullivan County Commissioners will be accepting sealed bids for the Elk Grove Gravel Bar Removal and Bank Stabilization Project on West Branch Fishing Creek in Davidson Township, Sullivan County. Work shall include all materials and labor necessary for the removal of a debris pile from the stream channel and gravel bar, the removal of a gravel bar, and the installation of two (2) mudsills and two (2) single-log vane deflectors within West Branch Fishing Creek. All in-stream required work cannot commence prior to June 2, 2023, and must be completed in accordance with in-stream restrictions on West Branch Fishing Creek by October 1, 2023. This project is being supported in part, by American Rescue Plan Act funds awarded to Sullivan County by the U.S. Department of the Treasury. A detailed cost breakdown of services according to the Scope of Services must be submitted with the bid. A certified check or bank draft payable to the order of Sullivan County Commissioners or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid, shall be submitted with each bid. The Bidder shall include the fully completed Non-Collusion Affidavit with the bid. Clarification Deadline: 4/3/2023 4:00 PM The Sullivan County Commissioners reserve the right to reject any or all bids, to waive any irregularities, or to negotiate contract amounts.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents