Similar Projects
Amidon Bridge at Arkansas River
Infrastructure
Bidding
$700,000 CJ est. value
Wichita, KS 67202

Milling and HMA Overlay
Infrastructure
Bidding
$3,000,000 CJ est. value
Valley Center, KS 67147

Shipping Building for CNH Wichita
New Construction - 18,900 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Wichita, KS 67215

Sanitary Sewer to serve Tru-Building Addition
Infrastructure
Post-Bid
$300,000 CJ est. value
Wichita, KS 67202

Grading and Surfacing. Bel Aire: Woodlawn St From 37th St Thru 45th St Intersection In Sg Co. Lgth Is 1.051 Mi
Infrastructure
Results
KS

Cherese Woods Addition Street Improvements - Phase 2
Infrastructure
Results
$2,000,000 est. value
Wichita, KS

ISG Office Space
Renovation - 4,960 SF
Construction
$250,000 to $280,000 est. value
Wichita, KS 67206

iHeart Media
Renovation - 2,306 SF
Construction
$330,000 est. value
Wichita, KS 67202

Dugan West Commercial - Storage Units
New Construction - 85,708 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Wichita, KS

Plumbers & Pipefitters
Build-Out - 45,000 SF
Pending Verification
Wichita, KS 67207

WM, WDS Phase 1, SWD
Infrastructure
Bidding
$200,000 CJ est. value
Wichita, KS 67202

Water, Sewer, and Storm Water for Cedar Ranch Estates Phase 2
Infrastructure
Post-Bid
$500,000 CJ est. value
Derby, KS 67037

300,000 Gallon Water Tower
New Construction, Renovation, Infrastructure
Results
$3,000,000 CJ est. value
Mulvane, KS 67110

Quik Invest Office And Retail Development
New Construction - 55,595 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Derby, KS 67037

Water Distribution System to Serve Turkey Creek 4th Addition Ph 1B
Infrastructure
Post-Bid
$700,000 CJ est. value
Wichita, KS 67202

Last Updated 08/02/2022 11:15 AM
Project Title

West Street Office and Warehouse Development

Physical Address View project details and contacts
City, State (County) Wichita, KS 67213   (Sedgwick County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $11,190,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope includes, but is not limited to site work and new construction of a 30,000-square foot office and warehouse facility. As of August 1, 2022 preliminary design is underway. Site plans have not been submitted for approval at this time. An architect and general contractor have been selected. Architect has not been authorized to move into construction documents at this time. Information regarding subcontractor bidding opportunities has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the second quarter 2022. *The owner requests that all subcontractor / supplier inquiries be directed to the GC.

Details

30,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents