Similar Projects
Warehouse/Storage Construction Project Lead, Graford, Waco, TX 76449 (McLennan, Palo Pinto Counties)
Last Updated | 02/11/2021 09:18 AM |
Project Title | Pre-Engineered Metal Building |
Physical Address | View project details and contacts |
City, State (County) | Graford, Waco, TX 76449 (McLennan, Palo Pinto Counties) |
Category(s) | Commercial |
Sub-Category(s) | Warehouse/Storage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 40’ x 60’ pre-engineered metal building. Building shall meet the specifications provided below or equal. 1. Building shall be 40 feet by 60 feet in dimension. 2. Building shall include the following: a. Eaves shall be 16 foot high b. Roof slope shall be 2 in 12 3. Following Building Codes Apply a. design code: IBC’15 b. closed / open: P c. exposure: C d. Importance - wind: 1.00 e. Site Class: D f. Importance - Seismic: 1.00 g. Seismic Coefficient: 0.13 h. Importance - Snow: 1.00 4. Following Building Loads Apply a. Dead Load: 2.50 psf b. Live Load: 20.00 psf c. Load Reduction: Yes d. Ground Snow: 5.00 psf e. Collateral: 10.00 psf f. Wind Load: 115 mph g. All beams, purlen, etc. must be primed h. Bracing details are as follows: i. Roof must have diagonal bracing j. Both endwalls must be rigid frame k. Front and Back sidewalls must have diagonal bracing 5. Framed openings are as follows: a. Left endwall will have opening 16 ft wide with 16-foot header b. Right endwall will have opening 16 ft wide with 16-foot header c. Front sidewall will have opening 16 ft wide with 14-foot header 8. Sheet and Trim Colors are as follows: a. Roof will be white PBR Panel, 26 gauge, with 30-year lifespan b. Walls will be white R Panel, 26 gauge, with 30-year lifespan c. Gables, eaves, corners and jambs will be white 9. Fasteners for Roof and Walls will be as follows: a. Panel: TEK1.25 b. Lap: LAPTEK c. Type: Painted 10. Ridge Coverings will be as follows: RFB No. 21-12-1194 Pre-Engineered Metal Building Page 6 of 9 a. Peak Sheets with Gutters and Downspouts on Front and Back Sidewalls 11. Following Accessories shall be included: a. WD: standard locksets - quantity of 2 b. WD: 3X7 Door WHT W/L - quantity of 2 c. WD: 8 ¼ inch by 3X7 W - quantity of 2 d. MUE RUD (or equal): 16 X 16 Wind Lock rollup doors - quantity of 2 e. MUE RUD (or equal): 16 X 14 Wind Lock rollup door - quantity of 1 f. Comm Ridge Vent with Closure - quantity of 2, both white 12. Building will have a trolley beam rated for 8000 pounds for 2 2-ton hoists running length of building. 13. Anchor Bolts and template set shall be provided. |
||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |