Similar Projects
Coral Springs Pre-K - 8 SMART Program
Renovation
Conception
$1,875,193 est. value
Coral Springs, FL 33065

Dania ES SMART Program
Conception
$1,065,000 est. value
Dania Beach, FL 33004

Faith and Life Fellowship Ministries and Alpha International Academy Charter School
New Construction, Renovation, Demolition - 19,443 SF
Design
$3,000,000 est. value
Hollywood, FL 33020

Bethlehem Junior Academy
Renovation - 3,000 SF
Design
Tamarac, FL 33319

Parkside Elementary School - Smart Program Renovations
Renovation
Bidding
$659,112 est. value
Coral Springs, FL 33065

Construction Manager at Risk Services for Robert C Markham Elementary School
Post-Bid
Less than $8,552,850 est. value
Pompano Beach, FL

Maplewood Elementary School - Smart Program Renovations
Renovation
Post-Bid
Less than $1,759,996 est. value
Coral Springs, FL 33071

Smart Program Renovations Panther Run Elementary School
Results
Less than $947,715 est. value
Pembroke Pines, FL 33029

Sunset Lakes Elementary School - SMART Program Renovations
Renovation
Results
Less than $8,003,377 est. value
Miramar, FL

Alazhar School
Addition - 19,785 SF
Construction
$1,711,950 est. value
Tamarac, FL 33068

Eagle Point Elementary School - Smart Program Renovations
Renovation
Construction
Sunrise, FL 33326

Mary M Bethune ES SMART Program
Conception
$2,337,647 est. value
Hollywood, FL 33020

Guidepost Montessori
Renovation - 16,885 SF
Design
Hollywood, FL 33020

Oakland Park Elementary School - Smart Program Renovations
Renovation
Post-Bid
Less than $2,013,071 est. value
Oakland Park, FL 33334

Fox Trail Elementary School - SMART Program Renovations
Renovation
Results
Less than $508,885 est. value
Davie, FL 33324

Reported 02/21/2020 12:00 AM
Project Title

Norcrest Elementary School - Smart Program Renovations

Physical Address View project details and contacts
City, State (County) Pompano Beach, FL 33064   (Broward County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Sub-Bidding, Construction Start Expected March 2020
Bids Due View project details and contacts
Estimated Value $2,360,000
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Work of this Contract comprises the general construction of, but not limited to: 1. Site Work: Aluminum Covered Walkway Maintenance 2. Mechanical. - Building 6 Mechanical System Replacement. - Building 9 Mechanical System Replacement. - Building 10 Pump Replacement. - Building 10 Piping Replacement. - Building 11 Mechanical Improvements. - Building 6,9,10,11,16,17 Controls Replacement. - Building 16 PTAC Unit Replacement. - Building 17 Piping Replacement. - Building 17 Pump Replacement. 3. Roofing - Reroofing Building 7,9,10,11. 4. Media Center Improvements

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents