Similar Projects
Attic Insulation, Ventilation and Air Sealing Musketahquid Village Elderly Development
Alteration
Bidding
$100,618 est. value
Sudbury, MA 01776

Morse Library HVAC and Controls Upgrades - General Bid
Alteration
Bidding
Natick, MA 01760

Well 4 Water Treatment Plant Upgrades - Filed Sub-Bids
Alteration
Sub-Bidding
$4,500,000 est. value
Maynard, MA

Cambridge Electrical Department - The Shop - Slab Replacement - Sub Bid
Alteration
Sub-Bidding
$1,000,000 est. value
Cambridge, MA 02141

On-Call Services for Repairs to HVAC Systems in City Owned Buildings
Post-Bid
Less than $150,000 est. value
Woburn, MA

Maintenance and Repair of HVAC for Various Schools
Post-Bid
Everett, MA

HVAC Maintenance and Repair Services
Results
Natick, MA 01760

Rehabilitate Visitor Center HVAC System, LOWE
Results
$500,000 to $1,000,000 est. value
Lowell, MA

Central Fire Station HVAC Controls Upgrade
Alteration
Bidding
$23,900 est. value
Burlington, MA 01803

Station 4 Air Conditioning Project
Post-Bid
Less than $125,000 est. value
Reading, MA 01867

J041--Inspect and Clean Ductwork Bedford Massachusetts VAMC
Results
Bedford, MA 01730

On-Call Certified Mitsubishi Diamond Commercial Contractor
Alteration
Bidding
Lexington, MA

Purchase and Install HVAC Ionization and UV System Upgrades at Library Facilities
Post-Bid
Concord, MA

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

Hot Water Boiler Replacement and HVAC Controls Upgrade
Alteration
Bidding
$700,000 est. value
Hopkinton, MA 01748

Reported 04/07/2022 12:00 AM
Project Title

Rooftop Unit (RTU-3) Replacement at Weston Middle School - General

Physical Address View project details and contacts
City, State (County) Weston, MA 02493   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required. Removal of existing packaged DX, gas fired rooftop unit, electrical and automatic controls. Installation of new packaged DX, gas fired energy recovery rooftop unit, electrical, automatic controls and appurtenances. New gas piping and valve connection to rooftop unit. Factory startup and commissioning of new rooftop unit and applicable controls. Electrical: Electrically disconnect all mechanical equipment indicated to be removed. New power wiring to new mechanical equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents