Similar Projects
On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

18” Well Transmission Pipeline Project - Materials Supply
Post-Bid
Hurricane, UT 84737

Construction of the 2019 Fire Flow Projects
Results
UT

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Spanish Fork Ne Irrigation Pipeline
Results
Spanish Fork, UT

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

2019 Public Works Project
Results
Hyrum, UT 84319

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

2020 Water Line Projects - 100 E, 200 E, and 300 E
Post-Bid
Midway, UT 84049

500 South Surplus Siphon Vault Replacement
Results
Less than $244,438 est. value
Salt Lake City, UT 84104

Construction of 625 West Waterline Replacement
Post-Bid
Bountiful, UT 84010

Scenic Drive Upper Conduit Slipline Project
Results
Less than $695,500 est. value
Salt Lake City, UT 84104

2020 Geneva Park Parking Lot Project
Post-Bid
$375,000 to $445,000 est. value
Orem, UT 84057

Reported 03/02/2021 12:00 AM
Project Title

Jensen Water Improvement District - Water Improvements Project 2021

Physical Address View project details and contacts
City, State (County) Vernal, UT   (Uintah County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of 2 parts: Schedule A: On Highway 149 a new 8” HDPE line will be installed along the highway from the end of the 12-inch PVC Line at 4000 South northward to Brush Creek Road. From there it will continue west up Brush Creek Rd and meet up with the existing 8-inch PVC line at approximately 9000 E Brush Creek Rd. The line is approximately 7,250 ft and will include the installation of fire hydrants, air valves, and connections as well as several utility crossings as shown in the plans. Schedule B: This schedule consists of relocating the existing 10-inch PRV located at 4345 E Highway 40 approximately 1,200 feet downstream and re-plumbing the supply from the Sunshine Bench tank to flow upstream of that PRV. A PRV vault will be put in place and a bypass valve also installed. Additionally, a bypass will be added on Highway 40 at the inlet/outlet for the Naples tank.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents