Similar Projects
East High Street (Us 27) Sanitary Sewer Replacement Miami University
Bidding
$310,000 est. value
Oxford, OH 45056

Butterworth Road Sewer Extension Project
Bidding
Less than $411,695 est. value
Loveland, OH 45140

Campus Green Garage Sewer Lining
Post-Bid
Less than $350,000 est. value
Cincinnati, OH

Scioto County - Interceptor Lining and Manhole Project
Post-Bid
Less than $1,824,700 est. value
Portsmouth, OH

Sunset Drive Area – Utility Improvements
Results
$350,000 est. value
Bay Village, OH

C.I.P. Storm and Sanitary Sewer – Phase I
Results
Less than $1,590,715 est. value
Kenton, OH 43326

South Grand Avenue Sewer Improvements
Bidding
Marion, OH 43302

2021 Sewer Pump Outs
Term Contract
Post-Bid
Clarksfield, OH 44889

2019 Sanitary Sewer Repairs Phase II
Results
Less than $221,832 est. value
Upper Arlington, OH 43221

Haus Lane Sewer Lateral Assessment
Bidding
$47,300 est. value
Cincinnati, OH 45211

Southeast Storm Sewer Phase III Said Improvements
Post-Bid
Galion, OH

Amsterdam Area Sewer System - Carroll County Sewers
Results
Less than $1,949,643 est. value
Steubenville, OH 43952

Phase VI Part D - Cell Preparation and Leachate Force Main Construction
Bidding
Less than $1,293,000 est. value
OH

Residential Sanitary Sewer Connection
Post-Bid
Less than $87,400 est. value
Logan, OH 43138

CSO Outfall Repairs and Improvements
Results
Less than $2,900,000 est. value
Cleveland, OH 44115

Last Updated 02/01/2021 09:15 AM
Project Title

Guernsey Power Station Sanitary Sewer Extension Phase 3

Physical Address View project details and contacts
City, State (County) Byesville, OH 43723   (Guernsey County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 3 includes 8,444 LF of 10-inch forcemain along Pioneer Rd (Guernsey County Rd 42) through Byesville, crossing a CSX railroad and discharging into the wetwell at the WWTP. The project also includes a new pump station in front of the Meadowbrook High School on the corner of SR 821 and Lucasburg Rd, as well as 2,725 LF of 8-inch gravity sewer on SR 821 (Marietta Rd) to serve existing homes on septic tanks. Phase 2 will be under construction at the same time (starting late January 2021) by Border Patrol, Inc and includes 6-inch forcemain along SR 821 south of the pump station as well as 10-inch forcemain on Country Club Rd.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents