Similar Projects
FTTC Campus Center Piping Replacement Project Rockwell Campus
Infrastructure
Bidding
$500,000 est. value
Oklahoma City, OK 73142

Water System Improvements
Alteration
Bidding
$200,000 est. value
Oklahoma City, OK

W912bv21r0047-Presolicitation Notice (Sources Sought)- Bureau of Reclamation Waterline Relocation, Tinker AFB
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Oklahoma City, OK 73145

AMI Electric and Water Meter Installation
Infrastructure
Post-Bid
Edmond, OK

Choctaw 23rd Street Utility Extension
Infrastructure
Results
$615,000 est. value
Choctaw, OK

Drainage Improvements at N County Line Road and NW 90th Street
Infrastructure
Results
$550,000 est. value
Oklahoma City, OK

Installation of AMR Water Meters and Gas Meters and provide AMR system
Infrastructure
Post-Bid
Jones, OK

Pressure Control Valve Installation
Infrastructure
Results
$2,123,519 est. value
OK 73106

Terrace Work, Pond Work and Waterway Repair | N/2 Sec 21-26N-22WIM
Infrastructure
Post-Bid
Oklahoma City, OK

Tower-4 Water Line
Infrastructure
Results
Edmond, OK

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Water and Sanitary Sewer System Improvements
Infrastructure
Results
Harrah, OK

Water Meters, Meter Boxes Fire Hydrants and Valves
Alteration
Post-Bid
Del City, OK

Atoka Pipeline Raw Water Transmission Line
Infrastructure
Results
$37,755,390 est. value
Oklahoma City, OK

Copper Meter Setters (FY23)
Infrastructure
Post-Bid
Edmond, OK

Last Updated 06/03/2022 12:14 AM
Project Title

Atoka Raw Water Pipeline Atoka Pump Station O to Colgate Pump Station

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK   (Oklahoma County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $68,453,860 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project herein contemplated consists of furnishing all services, labor, materials, equipment, transportation, and incidentals necessary and required for the complete and test the installation of the Project. This Project will include but is not limited to the following major items and appurtenances. - Water Main and Appurtenant Installation - Connection to Existing 72-inch - Plugging the End of the Water Main -Appurtenances and Testing of valves, blow-offs -Cleaning and Hydraulic Testing -Street and Driveway Repair -Right-of-Way Restoration and Cleanup -Provide "As-Built" Plans with GPS As Built Survey

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents