Similar Projects
RFQ Design - Grassy Branch Water Reclamation Facility Expansion
Addition, Demolition, Infrastructure
Bidding
$3,500,000 CJ est. value
Monroe, NC 28110

Southwest Regional Library - Site Work
Infrastructure
Bidding
$500,000 CJ est. value
Monroe, NC 28112

Downtown Pedestrian Improvement Phase I Project
Infrastructure
Post-Bid
Waxhaw, NC

South Church Street Stormwater Improvements
Infrastructure
Post-Bid
Waxhaw, NC 28173

Miscellaneous Concrete and Drainage Items Repair and Construction
Infrastructure, Alteration
Results

Polypropylene Pipe
Results

Grading, Drainage, Milling, Paving, Monolithic Concrete Islands and Thermoplastic Pavement Markings
Infrastructure
Bidding
$1,000,000 CJ est. value
Unionville, NC 28110

First Avenue Roadway and Drainage Improvements
Post-Bid
Indian Trail, NC 28079

Corrugated Aluminized Pipe
Infrastructure
Results
Monroe, NC 28110

Remove and Replace Structure #129 over Lanes Creek on SR 2111
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Wingate, NC 28174

Stallings Greenway Project
Infrastructure
Post-Bid
$110,000 est. value
Matthews, NC 28106

Roadway Sweeping, Large Debris Removal and Storm Drain Cleaning on Various Interstate and Primary Roads
Infrastructure
Results

Construction of a Roundabout at the Intersection of NC 200, NC 522 and Parkwood School Road
Infrastructure
Results
Monroe, NC 28110

ADA and Drainage Improvements at Indian Trail Elementary School
Infrastructure
Results
Indian Trail, NC 28079

Morgan-Windsor Alley Improvements
Demolition
Results
Monroe, NC

Last Updated 07/25/2022 01:07 PM
Project Title

Twin Pines Erosion Remediation Project - Phase 1

Physical Address View project details and contacts
City, State (County) Stallings, NC 28104   (Union County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $53,457 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 25, 2022. The Project has been awarded to Aqualis for the awarded amount of $53,457.25.** This project is the first phase of a three-phase project and will enhance approximately 6,350 linear feet of Stewart Creek. The stream enhancement work for this project phase extends from State Street to Irwin Creek Bid, Performance, and Payment & Material bonds shall be required for this project. Each bid that equals or exceeds $50,000.00 shall be accompanied by a corporate bid bond or a bid deposit of a certified or cashier's check in the amount of at least 5% of the total amount bid for the contract. When a bid is secured by a bid deposit (certified check or cashier's check), the execution of a bid bond will not be required. When the bid security is in the form of a bid bond, that bid bond shall be executed by a corporate surety. The laws of North Carolina and applicable regulations of various Licensing Boards and M/W/SBE provisions will be observed in receiving bids and awarding contracts. The Town of Stallings reserves the right to reject any or all proposals and to waive informalities or technicalities, as it may deem to be in its best interest. Bidders will provide North Carolina General Contract License Number, Classification(s), and Limits in the space provided in the signature page of the bid. Bids may be held by the Town for a period not to exceed sixty (60) days from the date of the bid opening for reviewing bids and investigating qualifications of bidders. The itemized proposal form and Project Manual provided by the Town shall be used in its entirety. All entries including signatures shall be in ink. For information regarding this project contact: Bo Conerly, P.E., CFM Kimley-Horn and Associates, Inc. 980-495-3310 bo.conerly@kimley-horn.com 200 South Tryon St., Suite 200 Charlotte NC 28202

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents