Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Mahler Water Reclamation Facility Interim Improvements Project
Renovation, Infrastructure
Bidding
$8,196,000 CJ est. value
Sweet Home, OR 97386

Water Filtration System
Renovation
Bidding
$600,000 CJ est. value
Woodburn, OR 97071

On-Call Emergency and Non-Emergency Routine Plumbing Repair Services
Alteration
Post-Bid
Portland, OR

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Shasta Elementary School Restrooms Remodel
Renovation, Alteration
Results
Klamath Falls, OR 97625

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

RFP D/B - Backup Power at Lake Oswego-Tigard Water Partnership Facilities
Infrastructure
Bidding
$2,000,000 CJ est. value
Lake Oswego, OR 97034

CB2 at Brewery Blocks 2 Building
Alteration
Post-Bid
Portland, OR

Commercial Plumbing Service
Alteration
Results
OR

On-Call Trade Services for Prevailing Wage Projects
Term Contract
Post-Bid
OR

Abandonment of Reservoir 9-1 and 9-2 and Pump Station 11
Infrastructure
Results
$167,495 CJ est. value
Tigard, OR 97223

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Philomath Water Treatment Plant Improvements, Phase I
Infrastructure
Results
$4,161,000 CJ est. value
Philomath, OR 97370

Plumbing Supplies - EOCI
Term Contract
Post-Bid
Umatilla, OR 97882

Last Updated 02/24/2023 04:36 AM
Project Title

Water System Improvements Project A

Physical Address View project details and contacts
City, State (County) Willamina, OR 97396   (Yamhill County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $4,286,103 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of installation of 3,352 linear feet (LF) of 12-inch diameter, fused C900 polyvinyl chloride (FPVC) raw water pipeline within an existing public right-of-way and a utility easement (PUE); installation of 3,090 LF of 12-inch FPVC diameter distribution main within public roads and greenfield PUEs; installation of 540 LF 8-inch diameter PVC water pipeline; construction of a new CMU block building; installation of a fire pump with variable frequency drive (VFD); installation of VFDs with sine wave filters onto existing booster pumps; installation of an emergency generator; replacement of the existing SCADA and controls system, and all labor, Equipment, Materials, and incidentals necessary to complete the Work as specified. This project is funded whole or in part by local funds and the following funding Agency Partners (Agency): . Federal Safe Drinking Water Revolving Loan Fund (SDWRLF) . Federal Community Development Block Grant CARES Act Funding, Impact Assistance Public Facilities Grant (CDBG-CV) . Yamhill County ARPA Grant . U.S. Environmental Protection Agency (EPA) Community Grant Bidders shall comply with Agency requirements, including American Iron and Steel (AIS) and Buy American Sourcing requirements (i.e., BABA), as included in these specifications and submit the required forms. Questions regarding the project should be referred to Jeff Brown, Public Works Director (brownj@ci.willamina.or.us), Luke Tabor, EI, Project Engineer, Keller Associates, (ltabor@kellerassociates.com), and Shannon Williams, PE, swilliams@kellerassociates.com. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. This is a public work contract subject to ORS 279C. 800 to 279C.870 and the federal prevailing rate of wage required under the Davis-Bacon Act (40 U.S.C. 276a) and related acts, and any amendments in effect at time of solicitation. Both State and Federal prevailing wage laws apply. Oregon law requires that the higher of the State prevailing wage rates or Federal Davis-Bacon Act prevailing wage rates be paid to workers on projects subject to both the State prevailing wage rate law and Federal Davis-Bacon Act. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items and Scheduled items as indicated in the Bid Form. Bid security shall be furnished in accordance with the Instructions to Bidders. The successful bidder will be required to furnish to the Owner a performance bond and a payment bond each equal to one hundred percent (100%) of the amount of the bid. The successful bidder and all subcontractors will be required to furnish to the Oregon Construction Contractors Board a public works bond in the amount of five percent (5%) of Bidder's maximum Bid price (determined by adding the base bid, Schedule A, and all alternates), unless exempt under ORS 279C. The Owner reserves the right to reject any and all bids, to waive any irregularities, and to accept the bid deemed in the best interests of Owner. Owner may reject any bid not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all bids upon a finding of the agency, if it is in the public interest to do so. The Contractor shall note that this is a public works contract subject to subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (Section 3). As such, preference shall be given to qualified Section 3 Business Concerns when awarding the Contract. Additionally, this calls for affirmative action by the Contractor to train and/or hire Section 3 Workers and to Subcontract with Section 3 Business Concerns. Section 3 businesses must meet minimum qualifications, including prequalification with the City, and have the ability and capacity to perform successfully under the terms and conditions of the proposed contract. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron and steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. This project is financed with federal monies that may be subject to statutory requirements commonly known as "Build America, Buy America" provisions of the Infrastructure Investment and Jobs Act (IIJA) (P.L. 117-58, 70911-70917). The Buy America Sourcing requirements under the IJLA requires all of the iron and steel, manufactured products, and construction materials used in the project to be produced in the United States (Build America, Buy America [BABA] Requirements). Project entails installation of 540 555 linear feet (LF) of 8-inch diameter C900 polyvinyl chloride (PVC) water pipeline; trench excavation; shoring; pipe bedding; pipe zone backfill; general backfill; pipe anchors; ductile iron, corrosion coated, restrained, mechanical fittings, joints and valves; disinfection and pressure testing; construction of a new CMU block building; installation of a fire pump with VFD; installation of VFDs with sine wave filters onto existing booster pumps; installation of a new emergency generator, and replacement of the existing SCADA and controls system

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents