Similar Projects
Stunner Bridge Repair
Renovation
Design
$500,000 to $1,000,000 est. value
Monte Vista, CO

Stunner Bridge Repair
Renovation
Design
$500,000 to $1,000,000 est. value
Monte Vista, CO

Elbert Bridge Deck Replacement Project
New Construction
Bidding
Colorado Springs, CO

MESA-58-M.6 Bridge Replacement Project
Infrastructure
Bidding
Collbran, CO 81624

Rio Blanco County Bridge Maintenance
Post-Bid
Meeker, CO 81641

2021 Wildin Bridge Repair and Decking Replacement
Post-Bid
Aspen, CO 81611

Y--SJCP OSO Bridge and Culverts
Results
$1,000,000 to $5,000,000 est. value
CO

Park Avenue Viaduct Preventative Maintenance Phase 2
Results
$14,300,000 to $15,400,000 est. value
Denver, CO 80202

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

LoVA Colorado River Bridge at I-70 MM 108.5
New Construction, Infrastructure
Bidding
New Castle, CO

Beckers Lane Bridge Replacement
Post-Bid
Manitou Springs, CO 80829

Maroon Creek Trail Bridge
Results
$100,000 to $240,000 est. value
Aurora, CO 81611

4 Bridge Rehabs at 3 Separate Locations
Renovation, Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
CO

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

2nd Avenue Bridge Replacement
Results
Lyons, CO

Reported 02/24/2022 12:00 AM
Project Title

Woodbridge Siding and Decking Project

Physical Address View project details and contacts
City, State (County) Snowmass, CO   (Pitkin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design and Construction Management for the design and construction management of the replacement decking of Woodbridge. The decking and underlying substruction of the deck of the bridge has become worn with age. It is suspected the substructure of the decking is no longer viable to support the wood plank decking of the bridge. The Town is looking for proposals of new decking design and replacement of the substructure holding the decking up. As the bridge has aged, changing uses of the bridge have come along as well, including UTVs driving across, skier traffic, snow grooming equipment, and pedestrians. The Town is looking for a decking design solution to meet all of these needs. The Siding and Railing system of the bridge has become outdated and the risks of a piece of siding falling onto the road below has become a concern. The Town is looking for a proposal to update the siding of the bridge while keeping with the “Mt. Daily'' theme that already exists.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents