Last Updated | 11/03/2020 10:08 AM |
Project Title | Y1PC--Ohio Western Reserve National Cemetery, Phase 3 Tiered Evaluation |
Physical Address | View project details and contacts |
City, State (County) | Akron, OH (Summit County) |
Category(s) | Religious/Funeral |
Sub-Category(s) | Funeral Facility |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $20,000,000 to $50,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Ohio Western Reserve National Cemetery, Phase 3 Tiered Evaluation: project will develop approximately 15 acres of land to provide 20,422 gravesites, including both casket and cremation sites. The project will include 6,840 standard-size pre-placed crypts, 560 oversize pre-placed crypts, 3,625 in-ground cremains burial sites, a 9,386-niche Columbarium, and two Memorial Walls providing a total of 182 markers. The project will also add a Committal Shelter, extended roadways, utilities, lighting, signage, landscaping, GPS/GIS and irrigation in support of the expansion area. The project will also provide the following; expanded cortege lanes and bypass lane; upgrade the existing irrigation system to include a new pump station, two new wells, and new controls; replace pavers in an existing Columbarium with concrete pavement; mill and overlay all existing asphalt roads; provide curb and gutter for existing roads; make minor renovations to two existing Committal Shelters; replace all existing Cemetery signage; provide a new salt storage bin at the Maintenance Building; repave the existing Memorial Walk. Furthermore, there are four bid Add Alternates consisting of renovations to the existing Public Information Center, replacement of stamped concrete pavement at a second existing Columbarium, renovations to the existing Administration Building, and replacement of pavers with concrete at the existing Carillon and Flag Assembly Area. Contract duration will be 940 calendar days. There is an Early Turnover (ETO) component consisting of the Columbarium, new roads/infrastructure supporting the Columbarium, and Memorial Walls/Memorial Walk. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |