Similar Projects
CR 591 / Morningside Dr at Mill Creek / Lick Log Creek S of Hiram
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Dallas, GA 30132

Vista Lake Development Paving Project
Infrastructure
Bidding
$1,286,000 CJ est. value
Dallas, GA 30157

2023 LMIG Paving Project
Infrastructure
Bidding
$1,286,000 CJ est. value
Dallas, GA 30132

North Paulding High School Addition Phase I - Paulding County School District
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$400,000 CJ est. value
Dallas, GA 30132

2022 - Parking Lot Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Hiram, GA 30141

Transfer Station Scale House
New Construction, Infrastructure
Results
Dallas, GA 30132

Demolition and Reconstruction of Pavilion/Bathroom
Demolition, New Construction, Infrastructure
Results
$751,308 CJ est. value
Dallas, GA 30157

Mavis Tire #2021
New Construction - 6,979 SF
Construction
$1,600,000 est. value
Dallas, GA 30157

Strickland Brothers 10 Minute Oil Change
New Construction - 1,725 SF
Construction
$1,150,000 est. value
Dallas, GA 30157

Morningview Baptist Church New Sanctuary
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Dallas, GA 30132

2023 Asphalt Bituminous Surface Treatment Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Dallas, GA 30132

2022 - Arnold Lane (Water Main)
Infrastructure
Results
$908,251 CJ est. value
Hiram, GA 30141

Paulding County School District - Middle School #10
New Construction, Infrastructure - 148,000 SF
Post-Bid
$30,000,000 CJ est. value
Dallas, GA 30132

Griffin Creek Sewer at S.R. 6 Business
Infrastructure
Results
$575,217 CJ est. value
Dallas, GA 30132

Battlefield Trail Connector
Infrastructure
Post-Bid
$200,000 CJ est. value
Dallas, GA 30132

Last Updated 07/07/2023 03:03 PM
Project Title

Caliber Collision / Hiram

Physical Address View project details and contacts
City, State (County) Hiram, GA 30141   (Paulding County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Abandoned, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 7 2023, This project was abandoned. Complete site work improvements (2.56 ac disturbed) to include grading, utilities, curb, paving, landscaping, and other site improvements per plans, Geotechnical report, and specifications. New PEMB building furnished by Client (approximately 14,651 SF) with included finished office space (2,000 SF). *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

1 Story Above Grade, 16,413 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents