Similar Projects
Metropolitan Wastewater Treatment Plant (MWWTP) Services Buildings and Site Improvements - Step 2
Renovation, Infrastructure - 40,000 SF
Bidding
$35,000,000 est. value
Saint Paul, MN 55106

Expansion and Phosphorus Removal Project
Renovation
Bidding
$3,000,000 est. value
Austin, MN

Empire WWTP Solids Improvements Phase II
New Construction
Post-Bid
Farmington, MN 55024

Water Metering House - St. Peter Regional Treatment Facility
New Construction
Post-Bid
$147,643 est. value
Saint Peter, MN 56082

Wastewater Treatment Facility Improvements
Results
$1,800,000 to $2,000,000 est. value
Madelia, MN

2021 Wastewater Treatment Facility Improvements
Addition
Results
$10,000,000 est. value
Melrose, MN

Regional Wastewater Treatment Facility - Contract 1
New Construction
Construction
Oronoco, MN

WLSSD Wastewater Treatment Facility
New Construction
Post-Bid
Duluth, MN

2021 Odor Control Media Procurement
Results
Saint Paul, MN

Wastewater Treatment Facility
Addition
Post-Bid
Caledonia, MN

Wastewater Treatment Facility Improvements
Results
Houston, MN 55943

Wastewater Treatment Plant
Renovation
Post-Bid
$125,000 est. value
Vernon Center, MN

MWWTP Services Buildings and Site Improvements - Step 1
New Construction
Results
$35,000,000 est. value
MN

Wastewater Treatment Facility Scum Removal Improvements
Renovation
Results
Fairmont, MN

MNDOT Watonwan Rest Area WWTF Rehab
Results
$472,000 est. value
Saint James, MN 56081

Last Updated 06/07/2022 03:31 AM
Project Title

Wastewater Treatment Facility Flow Equalization System

Physical Address View project details and contacts
City, State (County) Crane Lake, MN   (Saint Louis County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New flow equalization system and miscellaneous WWTF system improvements, including new precast concrete settling tank, equalization tank, and effluent manhole and related pump and piping work. Relocate influent sampler to new fiberglass sampler shelter building. Piping modifications to existing forcemain. Other related earthwork and electrical work.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents