Similar Projects
Women's Baseball Center Museum - City of Rockford
New Construction, Infrastructure
Conception
$7,000,000 CJ est. value
Rockford, IL 61101

ENGIE Solar Farm
Infrastructure
Conception
$5,000,000 CJ est. value
Rockford, IL 61108

Colman Yards Barber Colman Mixed-Use Development
New Construction, Infrastructure, Build-out
Design
$400,000,000 CJ est. value
Rockford, IL 61101

Colman Yards Barber Colman Mixed-Use Development
New Construction, Infrastructure, Build-out
Design
$400,000,000 CJ est. value
Rockford, IL 61101

Rock Cut Elementary Gymnasium Addition - Bid Packages
Addition, Demolition, Infrastructure - 4,825 SF
Bidding
$3,000,000 CJ est. value
Loves Park, IL 61111

Parking Lot Crack Filling, Seal Coating, and Striping
Infrastructure
Post-Bid
Rockton, IL 61072

Gym Floor Asbestos Abatement
Term Contract, Infrastructure
Post-Bid
$121,000 CJ est. value
South Beloit, IL 61080

Sidewalk Replacement, New Sidewalks, Lighting Improvements, Streetscaping and Landscaping
Results
Durand, IL 61024

Alpine Road Improvements
Results
$2,920,808 est. value
Machesney Park, IL

Fleet Farm Retail Development
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Rockford, IL 61112

NorthPointe Birth Center
New Construction, Infrastructure - 8,700 SF
Pending Verification
$5,115,937 CJ est. value
Roscoe, IL 61073

Harlem High School Addition - Harlem Consolidated School District #122
Addition, Demolition, Infrastructure - 27,000 SF
Design
$13,500,000 CJ est. value
Machesney Park, IL 61115

2022 Pavement Improvement Project
Infrastructure
Post-Bid
$410,000 CJ est. value
Machesney Park, IL 61115

Road Reconstruction, Bridge Repairs, Culvert Replacements
New Construction, Infrastructure
Results
IL

Hard Rock Casino
Demolition, New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Rockford, IL 61108

Last Updated 03/23/2023 04:52 PM
Project Title

IL 251 Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Machesney Park, IL 61115   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $548,028 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 2, 2022 project was canceled. No definite date for the rebid. The Village of Machesney Park acting through its Board of Trustees, hereby gives notice that sealed Bids will be received in the Village of Machesney Park Village Hall for the following described project. PROJECT - This project consists of Portland cement concrete sidewalk improvements along the west side of IL 251 from Peachtree Circle to Shoreland Road. Ancillary improvements shall consist of the replacement of adjacent driveway aprons, curb & gutter, structure adjustments, and curb ramps along with restoration and traffic control. Bids will be received on the following Contract(s): Section No. 21-00033-00-SW IL 251 Sidewalk Improvements Bids shall be sealed and shall have the name and address of the Bidder and the Contract for which the Bid is being submitted on the outside of the envelope. All Bidders shall Bid in accordance with and upon the Bid Forms included in the Contract Documents. Contractors must be pre-qualified and have a current Certificate of Eligibility with the Illinois Department of Transportation to be eligible for this project. Contact QuestCDN at 952-233-1632 or info@questcdn.com for assistance in free membership registration, downloading, and working with this digital project information. BID SECURITY - No Bid shall be received unless accompanied by a Certified Check or satisfactory Bid Bond payable to the Village of Machesney Park in an amount not less than five percent (5%) of the maximum Bid as a guarantee that, if the Bid is accepted, the Bidder will execute and file the Contract, Performance/Payment Bonds and Insurance Certification, as required by the Contract Documents, within ten (10) days after the Notice of Award. BID REJECTION - The OWNER reserves the right to reject any and all Bids, waive any informalities in Bidding or to accept the Bid or Bids which best serves the interests of the Village of Machesney Park. WITHDRAWAL OF BIDS - No Bid shall be withdrawn for a period of 45-days after the scheduled opening without the consent of the OWNER. STATE OF ILLINOIS GOVERNING LAWS AND REGULATIONS Contract Letting 1. The contract letting shall be subject to Illinois Statutes. Equal Employment Opportunity 1. CONTRACTOR shall comply with the Equal Employment opportunity requirements in the contract documents and certify that the Contractor is not barred from contracting with a local unit of government as a result of a violation of either Section 33E-3 or 33E-4 of the Illinois Criminal Code. 2. The CONTRACTOR and subcontractors must comply with the Illinois Human Rights Act, the Rules and Regulations of the Illinois Department of Human Rights, and Orders of the Illinois Human Rights Commission, provisions of the Public Works Employment Discrimination Act, 775 Illinois Compiled Statues, 10/0.01, and the requirements of the Illinois Equal Employment Opportunity clause. Minimum Wage 1. The CONTRACTOR shall be required to pay not less than the minimum wage rates established by the OWNER, as stated in the Advertisement For Bids. 2. Copies of the applicable wage rates are on file with the OWNER and/or incorporated in the contract documents. 3. The CONTRACTOR shall pay prevailing wages in accordance with, "An act regulating wages of laborers, mechanics and other workers employed in any public works by the state county city or any public body or any political subdivision or by anyone under contract for public works" (820 ILCS 130 et Seq.). The minimum hourly rate of wages, as determined by the Wage Determination Decision of the Illinois Department of Labor referred to in these standards is included in the bid packet Published by the authority of the Village of Machesney Park acting through its Board of Trustees.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents