Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

2021 OPWC Road and Bridge Safety Upgrade Program
New Construction, Infrastructure
Bidding
$2,612,581 est. value
Boardman, OH

Brungard Road Upgrades - Phase 2
Infrastructure
Bidding
$89,000 est. value
New Middletown, OH 44442

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

321 Mathews Road Asphalt Paving
Results
$29,020 est. value
Youngstown, OH 44505

2020 Resurfacing Program
Results
Less than $125,000 est. value
Poland, OH 44514

Intersection - SUM-Wooster Road Robinson
Infrastructure
Bidding
$1,248,937 est. value

Asphalt Replacement and Repair
Post-Bid
Youngstown, OH

Chip Seal - Chip FY2021
Results

South Cadillac Drive - Phase 2 and Brookfield Avenue Storm Sewer Improvements
Infrastructure
Bidding
$235,000 est. value
Boardman, OH 44512

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Two Lane Resurfacing - SR 170-00.78/Var
Results
Poland, OH 44514

Wildwood and Ewing Storm Improvements
Renovation, Infrastructure
Bidding
$200,000 est. value
Boardman, OH 44512

Commercial Asphalt Resurfacing and Striping Parking Lots
Infrastructure
Post-Bid
Sebring, OH 44672

Last Updated 02/10/2022 12:45 PM
Project Title

2022 Chip Seal Program

Physical Address View project details and contacts
City, State (County) North Lima, OH   (Mahoning County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $93,904
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes resurfacing the following Beaver Township Roads with a double chip seal pavement overlay: Base Bid 1. Germantown Rd. (from W. Garfield Rd. to Renkenberger Rd.; length = 2,645`) 2. Renkenberger Rd. (from SR46 to New Buffalo Rd.; length = 5,330`) 3. Knopp Rd. (from Germantown Rd. to Green-Beaver Rd.; length = 5,200`) Alternate Bid "A" 4. Beaver-Springfield Rd. (from E. Pine Lake Rd. to Woodworth Rd./SR165; length = 3,340`). Alternate Bid "a" $25,977.00

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents