Similar Projects
Boylston Street Townhouse Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Brookline, MA 02445

The Learning Experience / Franklin
New Construction, Infrastructure - 5,250 SF
Conception
$1,000,000 CJ est. value
Franklin, MA 02038

Holmes Street Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
North Quincy, MA 02171

Bennett Lane Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$19,000,000 CJ est. value
Quincy, MA 02169

Courts, Boardwalk and Stairs Reconstruction at Baker School
Infrastructure
Bidding
$500,000 CJ est. value
Boston Clg, MA 02467

Construction of New Fire Station - GC Bid
New Construction, Infrastructure - 26,694 SF
Bidding
$19,000,000 CJ est. value
Norfolk, MA 02056

Construction of New Fire Station - Sub Bid
New Construction, Infrastructure - 26,694 SF
Sub-Bidding
$19,000,000 CJ est. value
Norfolk, MA 02056

RFQ Contractor - Elizabeth G. Lyons Elementary School - Sub Bid
New Construction, Infrastructure - 73,600 SF
Sub-Bidding
$41,576,600 CJ est. value
Randolph, MA 02368

John D. Hardy Elementary School / Wellesley
Demolition, LEED Certification, New Construction, Infrastructure - 81,390 SF
Post-Bid
$57,300,000 CJ est. value
Wellesley, MA 02482

Excavation for Identification of Water Services
Post-Bid
$1,230,142 est. value
Boston, MA

Excavation Work
Infrastructure
Results
$60,000 est. value
Boston, MA

Campsite Restorations
Infrastructure
Results
$2,000,000 est. value
Barnstable, Boston, Essex, Norfolk, Plymouth, Worcester, MA

Maple Street Solar
New Construction
Construction
Less than $1,791,080 est. value
Bellingham, MA

Gillette Stadium Renovation
Addition, Renovation, Infrastructure
Construction
$225,000,000 CJ est. value
Foxborough, MA 02035

Factory Square Redevelopment
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Franklin, MA 02038

Last Updated 11/18/2022 11:28 AM
Project Title

Pecunit Water Treatment Facility GAC Addition - Sub

Physical Address View project details and contacts
City, State (County) Canton, MA 02021   (Norfolk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,312,301 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 18,2022, this project was awarded to D&C Construction, awarded amount is $2,312,300.50. For HVAC & Electrical. Contractor Qualification DCAMM Certificate value reflects from GC bidding project

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents