Similar Projects
Standard Aluminium Pole
Post-Bid
Nashville, TN

LED Decorative Street Light Fixture
Post-Bid
Springfield, TN

Stratford Park New Streetlight Installations
New Construction
Results
Knoxville, TN 37912

Tom J Hitch Parkway and Iron Bridge Road Traffic Signal
Results
TN 38401

Highway - 2021 Sign Post
Term Contract
Post-Bid
TN

West Jackson Streetlights
Results
Knoxville, TN

Pedestrial Road Flashing Crosswalk Signal Lights
Infrastructure
Post-Bid
Gallatin, TN

Streetlight Replacement
Results
Memphis, TN

Weathering Steel Transmission Poles
Term Contract
Post-Bid
Johnson City, TN

Street Lights
Results
$20,000 est. value
Smyrna, TN

Street Lights on Lowry Street
Infrastructure
Post-Bid
Smyrna, TN

Streetlight Poles
Term Contract
Results
Knoxville, TN

Electric Department Street and Security Lights
Term Contract, Infrastructure
Post-Bid
Springfield, TN

Sidewalk, Curb and Gutter, Crosswalks, Stormwater Drainage, Pedestrian Lighting, Utility Relocation, and Bike Racks
Infrastructure, Alteration
Results
$850,201 est. value
Kingston Springs, TN 37082

High Mast Preventative Maintenance and Repair
Alteration
Post-Bid
Athens, TN

Reported 07/05/2022 11:13 AM
Project Title

Downtown Crosswalk Lighting - City of Johnson City

Physical Address View project details and contacts
City, State (County) Johnson City, TN   (Washington County)
Category(s) Outdoor Lighting
Sub-Category(s) Roadway Lighting
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and outdoor lighting for a road / highway in Johnson City, Tennessee. Conceptual plans call for site work for a road / highway; and for outdoor lighting for a road / highway. A detailed scope has not yet been determined Downtown Crosswalk Lighting As of July 01, 2022, this project is currently in the FY 2023 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents