Similar Projects
Highlands at Settlers Ridge Residential Development
New Construction, Infrastructure
Design
Inver Grove Heights, MN

Area A of Mixed Use Campus
Infrastructure
Bidding
$2,350,000 est. value
Apple Valley, MN

Remove Bituminous Pavement
Infrastructure
Bidding
$2,350,000 est. value
Apple Valley, MN

2021 Crack Sealing and Seal Coating
Post-Bid
MN

2021 Reclamite Application
Post-Bid
West Saint Paul, MN 55118

CSAH 42/Akron Avenue Intersection Improvements
Results
Less than $2,700,000 est. value
Hastings, MN 55033

Grading, Bituminous Mill and Overlay
Results

Vita Attiva Development Expansion
New Construction, Infrastructure
Construction
Farmington, MN

River's Edge Development
New Construction, Infrastructure
Pending Verification
Farmington, MN

LHRP Campground Entrance Road
Infrastructure
Bidding
$575,000 est. value
Apple Valley, MN 55124

Phase II Phalen Transportation Improvements
Renovation
Post-Bid
Saint Paul, MN

Metro-Wide Traffic Control and Flood Sealing for Bridge Numbers 19095, 27624G, 27210, 9195, 27078, 27V59, 27517, 27526, 27654, 27265, 27R21, 9860, and 82527
Results

North Smoky Hills Graveling
Renovation
Post-Bid

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Hastings HS Tennis Court Replacement
Post-Bid
Hastings, MN 55033

Last Updated 08/02/2021 05:26 AM
Project Title

Central Eagan/Carlson Lake (LP-42) Improvements I

Physical Address View project details and contacts
City, State (County) Eagan, MN   (Dakota County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately: 470 SY Remove Bituminous Pavement 5 TREE Clear Grub Trees 245 LF Remove Concrete Curb Gutter Removal Replacement 1 EA Remove Storm Catch Basin 13 LF Remove Storm Sewer 260 CY Salvage and Respread Topsoil 3,000 CY Common Excavation Onsite 900 CY Common Excavation Offsite 3 EA 48'' to 84'' Storm Manholes 1 LS Pretreatment Structure 1 LS Underground Chamber (27,500 CF) 1 LS Filtration Manufactured Treatment Device 1 LS Sanitary Sewer Management 79 LF 6'' to 30'' RCP and HDPE Storm Sewer 150 TN Aggregate Base Class 5, 100% Crushed 100 TN Bituminous Pavement Together with Miscellaneous Structure Adjustment, Traffic Control, Erosion Contol Site Restoration

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents