Similar Projects
Parkview Building Exterior Repairs
Alteration
Bidding
Saint Louis, MO

Longview Farm Pedestrian Guard Rail Replacement
Infrastructure
Bidding
Saint Louis, MO 63141

Spanish Pond ADA Improvements
New Construction
Post-Bid
MO 63138

Main Park and Heritage Park Sidewalk
Post-Bid
Washington, MO

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

Sidewalk Maintenance and Curb Ramp Construction
Term Contract
Results
$1,700,000 est. value
Springfield, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Repair Building Exterior-Troop B Headquarters and Crime Lab
Infrastructure, Alteration
Bidding
Macon, MO

2021 Curb, Gutter, Sidewalk and Trail Program- Phase 1
Post-Bid
Gladstone, MO

East Side of Ward Parkway - W 83rd Street to W 84th Street
Results
Less than $110,995 est. value
Kansas City, MO 64114

Rock Bridge High Peach Tree Connector Driveway
Infrastructure
Bidding
Columbia, MO 65203

Shelby County R-IV School District-Parking Lot Improvements
Post-Bid
$850,000 est. value
MO

Interior and Exterior Repairs
Results
Chillicothe, MO 64601

University City Public Library Exterior Repairs
Alteration
Bidding
University City, MO 63130

Sidewalk Brick Band Replacement
Post-Bid
Kirksville, MO

Last Updated 06/07/2021 05:13 PM
Project Title

Repairs to Exterior and Parking Lots Troop G Headquarters and Crime Lab

Physical Address View project details and contacts
City, State (County) Willow Springs, MO   (Howell County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Finishes/Exterior, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SDVE Goals: 3% The work includes masonry repairs; exterior waterproofing; replacement of the glazed aluminum curtain wall assemblies to include tinting on the windows; replacing the concrete at the front entrance, steps and sidewalks; removal of existing pavement, rubblizing, and placing in a waste area on site; construction of a new concrete entrance, drive, and parking area with curb and gutters, miscellaneous drainage work; replacement of an existing canopy; and replacement of an existing flagpole and floodlight. SDVE 3%

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents