Similar Projects
45--Saguaro National Park Requires The Replacement of HVAC
Bidding
Tucson, AZ 85748

HVAC Supplies
Term Contract
Post-Bid
Tucson, AZ 85701

On-Call/Emergency Services
Post-Bid
Marana, AZ 85653

VA Tucson Replace AHUs for Critical Care and Sterile Processing
Results
$2,000,000 to $5,000,000 est. value
Tucson, AZ 85723

Safford K-8 School Boiler and Chiller Replacement
Results
Less than $604,872 est. value
Tucson, AZ 85701

DEMA SBAH Bldg L4535 Chiller Replacement (M20-0012) Single
Post-Bid
Marana, AZ

Dunham Elementary School Chiller Replacement
Term Contract
Results
Less than $539,465 est. value
Tucson, AZ 85748

VA Tucson Replace Air Distribution Systems - Building 57
Post-Bid
Tucson, AZ

Cavett, Manzo and Wheeler Elementary Schools Kitchen A/C Conversion
Term Contract
Results
$250,000 to $300,000 est. value
Tucson, AZ 85745

DEMA HVAC Duct Repair L4605 Silverbell Single
Post-Bid
Marana, AZ 85653

Dema HVAC Replacement Classroom Area L4300 (M20-0007) Single
Results
Marana, AZ 85653

Robert Naylor K-8 School Kitchen A/C Conversion
Post-Bid
Tucson, AZ 85711

Pistor Middle School Chiller Replacement
Term Contract
Results
Tucson, AZ 85746

Utterback Middle School Kitchen A/C Conversion
Post-Bid
Tucson, AZ 85713

Dema Sbah Bldg L4535 Chiller Replacement
Results
Marana, AZ 85653

Last Updated 10/09/2020 02:50 PM
Project Title

Dema HVAC Replacement L4650 - Silverbell Heliport

Physical Address View project details and contacts
City, State (County) Marana, AZ 85653   (Pima County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall replace four (4) HVAC split systems. Replace all interior Ductwork due to it being undersized. Research and develop Mechanical Engineering design drawings to resolve ongoing issues in the current system. Job is located at Building L4650 at Silver Bell Army heliport in Marana , AZ.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents