Similar Projects
Briarcliffe Acres Resurfacing Project
Bidding
$162,000 to $225,000 est. value
Myrtle Beach, SC

Asphalt Paving and Traffic Control for a Transportation Infrastructure Generating Economic Recovery (TIGER) Project
Post-Bid
SC

Tiger Grant 15 - Asphalt Paving and Traffic Control
Post-Bid
$35,000 to $55,000 est. value
SC

Group 6 Roadway Repair and Resurfacing Project
Results
SC

Tom Dorman Road and Hardee Road, Road Improvement Project
Results
Less than $738,876 est. value
SC

Reconstruction/Rehabilitation - District 5
Post-Bid

Bennet Loop Resurfacing Project
Results
Less than $189,672 est. value
SC

Reconstruction/Rehabilitation - District 5
Post-Bid

Bratcher Road - Road Improvement Project
Results
Less than $280,172 est. value
Conway, SC 29526

Intersection Improvements - US 378 at S-134
Results
SC

Dorchester Road and Harvey Road, Road Improvement Projects
Results
Less than $899,623 est. value
Conway, SC 29526

On-Call Pavement Repair Contractors for Horry County Department of Airports
Results
Conway, SC 29526

Roadway Improvements Champions Boulevard
Results
Less than $162,830 est. value
North Myrtle Beach, SC

Road Improvements - Fall 2019
Results
Less than $1,140,471 est. value
North Myrtle Beach, SC

Roadway Resurfacing
Results
Surfside Beach, SC

Last Updated 10/14/2020 07:09 AM
Project Title

Widen US 501 SB

Physical Address View project details and contacts
City, State (County) SC   (Horry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 1.000 Ea Utility Staking 1.000 Ls Large Public Water Relocation No. ____ 001 1.000 Ea Large Public Sewer Relocation No. ____ 001 1.000 Ea Traffic Control 1.000 Ls Clearing & Grubbing Within Right Of Way 1.000 Ls Removal & Disposal Of Existing Pavement 919.000 Sy Removal & Disposal Of Existing Asphalt Pavement 7,989.000 Sy Removal Of Exist. Guardrail 1,464.000 Lf Unclassified Excavation 16,664.000 Cy Borrow Excavation 53,510.000 Cy Borrow Pit Set-Up 1.000 Ls Muck Excavation 3,850.000 Cy 15" Diameter Pipe Additional Foundation Work 15.000 Lf 18" Diameter Pipe Additional Foundation Work 1,000.000 Lf 24" Diameter Pipe Additional Foundation Work 570.000 Lf 30" Diameter Pipe Additional Foundation Work 320.000 Lf 36" Diameter Pipe Additional Foundation Work 350.000 Lf 42" Diameter Pipe Additional Foundation Work 300.000 Lf 48" Diameter Pipe Additional Foundation Work 465.000 Lf 54" Diameter Pipe Additional Foundation Work 890.000 Lf 60" Diameter Pipe Additional Foundation Work 580.000 Lf Geotextile, Separation 4,450.000 Sy Geogrid Stabilization 6,400.000 Sy Stone Bridge Lift Material 7,300.000 Ton Granular Bridge Lift Material 5,100.000 Cy Fine Grading 33,537.000 Sy Flowable Fill 631.000 Cy Maintenance Stone 1,648.000 Ton Hot Mix Asphalt Base Course - Type a 17,561.000 Ton Liquid Asphalt Binder Pg64-22 2,416.000 Ton Milling Existing Asphalt Pavement 2.0" 61,515.000 Sy Milling Existing Asphalt Pavement (Variable) 5,100.000 Sy Milled-In Rumble Strip 5.434 Mi Hot Mix Asphalt Intermediate Course Type b 20,348.000 Ton Hot Mix Asphalt Surface Course Type b 10,957.000 Ton Temporary Construction Signs (Barricade Mounted) 32.000 Sf Permanent Construction Signs (Ground Mounted) 770.000 Sf Detour Signs 20.000 Sf Barricade - Type 3 30.000 Lf Temporary Concrete Barrier 200.000 Lf Thrie Beam g.r.Bridge Conn.(Supplemental To Temporary Concre 1.000 Ea Construction Zone Electric Changeable Message Sign (Trailer 3.000 Ea Type b - Flashing Light 8.000 Ea Pavement Markings(Temp-Paint) 4" White Broken Lines 24,000.000 Lf Pavement Markings(Temporary-Paint)-4" White Solid Lines 76,710.000 Lf Pavement Markings(Temporary-Paint)-4" Yellow Solid Lines 66,120.000 Lf Pavement Markings(Temporary-Paint)-24"White Solid Lines 1,500.000 Lf Pavement Markings(Temporary-Paint)-White Single Arrow 291.000 Ea Pavement Markings(Temp.-Paint)-White Combination Arrows 24.000 Ea Pavement Markings(Temporary-Paint)-White Word `Only 66.000 Ea Temporary Clear Pavement Markers Mono-Dir.- 4"x4" 550.000 Ea Temporary Yellow Pavement Markers Bi-Dir.- 4"x4" 40.000 Ea 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 9,600.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 27,000.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 1,600.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 16,075.000 Lf White Single Fish Hook Arrow Thermo.-125 Mil. 58.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 59.000 Ea White Lane Drop Arrow(Lt.Or Rt.)Thermo-125mil 3.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 200.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 28,400.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 480.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 30.000 Ea Flat Sheet, Type Xi, Size Determined By Msg, Overhead 369.000 Sf f&i Mounting Assembly For f.s. Sign Erctd On Mast Arm 64.000 Ea Extruded Panel Signs - Ground Mounted Extruded 31.500 Sf Extruded Panel Signs- Mounted Overhead 1,276.750 Sf Break-Away Sign Supports 247.000 Lb Removal Of i-Beam Supports 8.000 Ea Overhead Sign Structure No.(____) 002 1.000 Ea Overhead Sign Structure No.(____) 003 1.000 Ea Overhead Sign Structure No.(____) 004 1.000 Ea Overhead Sign Structure No.(____) 005 1.000 Ea Removal Of Overhead Sign Structure No.(____) 006 1.000 Ea Removal Of Overhead Sign Structure No.(____) 007 1.000 Ea Removal Of Overhead Sign Structure No.(____) 008 1.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 1,002.000 Lf Furnish & Install 2.0" Schedule 80 Pvc Conduit 4,045.000 Lf Furnish & Install 3.0" Schedule 80 Pvc Conduit 184.000 Lf Furnish & Install 2" Schedule 80 Hdpe Conduit (Directional Bored) 1,511.000 Lf Furnish & Install No. 14 Copper Wire, 4 Conductor - Black 4,214.000 Lf Furnish & Install No. 14 Copper Wire, 4 Conductor - Gray 5,643.000 Lf Furnish & Install No. 14 Copper Wire, 8 Conductor (Black) 5,448.000 Lf Furnish & Install No. 14 Copper Wire, 8 Conductor (Gray) 6,008.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 16,417.000 Lf Furnish & Install Fiber Optic Interconnect Center 4.000 Ea Sawcut For Loop Detector 5,759.000 Lf Furnish & Install Electrical Service For Traffic Signal 4.000 Ea f&i-13"x24"x18"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 51.000 Ea f&i-17"x30"x24"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 4.000 Ea Furnish & Install 13" x 32` Steel Strain Pole And Foundation 15.000 Ea Furnish & Install 3/8" Galvanized Steel Cable 3,074.000 Lf f&i - Contr 332/336 Cabinet Assembly - Base Mounted 005 4.000 Ea f&i Loop Detector Amplifier w/Harness 2-Channel w/Del/Ext Timing 3.000 Ea Furnish & Install - 12" 5 Section Signal Head 6.000 Ea Furnish & Install -12" 4 Section Signal Head 10.000 Ea Furnish & Install - 12" 3 Section Signal Head 006 58.000 Ea Backplate w/ Retrorefl.Borders For Traff. Sig. 74.000 Ea Removal,Salvage,&Disp.Of Existing Traf. Signal Equipment 1.000 Ls Temporary Adjustment Of Traffic Signal Equipment 1.000 Ls Remove Foundation For Steel Strain Pole - 18" Below Grade 15.000 Ea Furnish & Install Concrete Cabinet Foundation 4.000 Ea 15" Smooth Wall Pipe 60.000 Lf 18" Smooth Wall Pipe 3,480.000 Lf 24" Smooth Wall Pipe 1,888.000 Lf 30" Smooth Wall Pipe 1,048.000 Lf 36" Smooth Wall Pipe 1,144.000 Lf 42" Smooth Wall Pipe 988.000 Lf 48" Smooth Wall Pipe 1,544.000 Lf 54" Smooth Wall Pipe 2,956.000 Lf 60" Smooth Wall Pipe 1,932.000 Lf Catch Basin -Type 1 Cb - Type 1 4.000 Ea Drop Inlet Type 112 67.000 Ea Trench Drain-12" Median Application 197.000 Lf Junction Box (Special) 001 1.000 Ea Extra Depth Of Box 13.630 Lf Beveling Of Pipe End 24.000 Ea Concrete Curb And Gutter(1`-6") Vertical Face 316.000 Lf Concrete Median 645.000 Sy Rip-Rap (Class b) 586.000 Ton Geotextile For Erosion Control Under Riprap(Class 2)Type a 766.000 Sy Mt3 Leading End Treatment Tl3 7.000 Ea Mb Trailing End Treatment 4.000 Ea Resetm Mb Trailing End 5.000 Ea Mgs3 Gr Standard Shoulder 1,862.500 Lf 46ss Reinforced Barrier Wall 10.000 Lf 56ss Reinforced Barrier Wall 40.000 Lf Right Of Way Marker(Rebar And Cap) 57.000 Ea Right Of Way Plat 1.000 Ls Permanent Cover 19.817 Acre Temporary Cover 9.909 Acre Compost 533.000 Cy Fertilizer (Nitrogen) 1,982.000 Lb Fertilizer (Phosphoric Acid) 1,982.000 Lb Fertilizer (Potash) 1,982.000 Lb Agricultural Granular Lime 39,634.000 Lb Selective Watering 135,750.000 Gal Mowing 59.451 Acre Temporary Erosion Control Blanket (Ecb) 13.359 Msy Hydraulic Erosion Control Product (Hecp) - Type 1 16.167 Acre Hydraulic Erosion Control Product (Hecp) - Type 3 3.651 Acre Inlet Structure Filter - Type f (Weighted) 430.000 Lf Inlet Structure Filter- Type f (Non-Weighted) 30.000 Lf Sediment Tubes For Ditch Checks 7,165.000 Lf Silt Fence 11,600.000 Lf Replace/Repair Silt Fence 2,900.000 Lf Cleaning Silt Basins 1,072.000 Cy Removal Of Silt Retained By Silt Fence 1,160.000 Lf Inlet Filter Cleaning 74.000 Ea Inlet Structure Filter - Type d1 70.000 Ea Aggregate No.5 For Erosion Control (6" Uniform) 37.000 Sy Stabilized Construction Entrance 1,650.000 Sy On-The-Job Trainee (Roadway) 2,600.000 Hr

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents