Similar Projects
Mechanical Contractors and Related Trades
Bidding
FL

J--Return Fan, Replace
Post-Bid
Miami, FL 33125

HUD - AC Replacement in LAN Room on 6th Floor
Post-Bid
Miami, FL 33131

FDOT HVAC Install: Sneads WB Weigh Station
Results

Replace Package AC Unit
Results
Homestead, FL 33030

Chiller Plant Services
Term Contract
Post-Bid
Miami, FL 33199

Replacement of AHU-16
Results
Miami, FL 33136

Testing & Certifications of Fume Hoods
Post-Bid
Miami, FL 33125

Heat Pump AHU Replacement (SBE Set Aside)
Results
Miami, FL 33136

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

ACC-West Duct Heater Replacement (SBE Set Aside)
Results
$100,000 est. value
Miami, FL 33136

HVAC Chillers/Equipment and Water Treatment Services
Post-Bid
FL

J041--Chiller 1 and 3 VSD Replacement
Results
Miami, FL 33125

HVAC and Mechanical Products
Term Contract
Post-Bid

J045--Services: CLC Re-Heat Replacement, Miami VA
Results
Miami, FL 33125

Last Updated 10/22/2020 11:17 AM
Project Title

Replace Chillers and Air Handlers, Multi-Facilities

Physical Address View project details and contacts
City, State (County) Homestead, FL 33039   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Seeking Funding
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Repair by replacement a total of 3 air cooled chillers at various facilities. The cooling capacity of each chiller will be the same as the existing chiller it is replacing except for when the existing capacity is no longer manufactured. In those instances the next closest, adequate standard capacity will be used. Remove and properly dispose of the existing chillers. Modify the chilled water piping, electrical power supply, and control systems as necessary to accommodate the replacement chillers. Replace chilled water valves, relief valves, pressure gauges, and thermometers connected to the chilled water piping between each chiller and building envelope as well as the chilled water piping between each chiller and building envelope. If the chilled water pipes travel underground only replace the chilled water pipes above-grade. Add new chilled water storage tank for building 476. Fully integrate new chillers into existing BACnet DDC and demonstrate existing design functionality. Repair by replacement a total of 3 direct exchange (DX) split units at various facilities. The cooling capacity of the condensing units and the air-flow of the air handling units will be the same as the existing unit it is replacing except for when the existing cooling capacity or air-flow is no longer manufactured. In those instances the next closest standard cooling capacity and/or air-flow will be used. Remove and properly dispose of the existing units. Modify the duct work and electrical power supply. Fully integrate new AC systems into existing BACnet DDC and demonstrate existing design functionality. Perform air balancing for every point of air supply from each replacement air handling unit. Provide three (3) phase monitor for all new AC equipment to continuously monitor the incoming voltage and provide superior motor protection. All work shall be accomplished in accordance with the attached "draft" Statement of Work (SOW).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents